Laserfiche WebLink
r ., ':.... t -.n» fs-.,. •:.. .. ,. r. l Y 1r i •:4 9' wS:'• ..n:. <br /> Quarterly*port June 1998 <br /> Geweke Land.Development & Marketing ' <br /> I _ - • _ ._ •, _ f ,. a ' i. <br /> ` 16 South Cherokee Lane, Lodi,CaliforniaX. <br /> L0:' ti')1NTRODiTCTION�.AND SCOPE OF WORK <br /> s <br /> the"request of Geweke Land Development&'Markeiing:.(GLDM), ,and`in,accordance with <br /> Cleanup'and Abatement Order.No.�93-•701,Advanced.GeoEnvironmental, Inca(AGE)..has prepared <br /> this;'report:of'monitoring and.remediation'field•activities-performed at 16 South Cherokee Lane, <br /> Lodi, California during'the second-quarter•of:199&. The site and•its.surroundings are illustrated on <br /> Figure 1 - Vicinity.Map, Structures and well locations related,to the site are'shown on Figure 2',Site <br /> Plan. <br /> Groundwater and soil monitoring events are scheduled-on a periodic basis to assess remediation <br /> :progress and micro biological•activiti' ."The.scope,of woi'k:covered'by this report was to collect and <br /> evaluate field data,to`summarize the progress of the in-situ bioremediation project;.and to docurnent <br />' monitoring activities at the site during the secondquarter of;199$. Results'of pre'vious•investigatiohs <br /> are detailed in the.Problem Assessment Report (PAR) and the Quarterly Report = March 1996.," <br /> Analytical results from previous monitoring events are included in Tables. 4, 5-and,6 of this report.' . <br /> 2.0: PROCEDURES <br /> 2.1. ADDITION OF HYDROGEN PEROXIDE ' <br /> On,26°May'1998,-the addition of hydrogen peroxide,to ,wells at the site was performed.-,A'toial of142.gal : <br /> wells a on s to The h dro ro ide, dil t wap 1 percent,was added to fifteen monitoring and vapor <br /> . y g p , s added to,incre.ase dissolved 'oxygen concentrations'in <br /> ground water'to pramote'biodegradation,of hydrocarbons.:The volumes added to:each well are <br />' summarized on.Table 1 <br /> 1 .2.2. MONITORING WELL PURGE PROCEDURES ; <br /> •r <br /> Ori`09;June 1998;a Solinst water level meter was used to`measurethe depth to,ground water in each <br /> ' _ - <br /> monitoring well relative to'the top of the well casing r(Tab1e 2): Monitoring wells MW-6; M'W <br /> MW-8; MW-9; IVIW-11 MW=.12 and 1VIW=14'were:purged using a 2-inch diameter.submersible .. <br /> PUMPA.minimum of-three well volumes of water'was,reinoved.from each well: <br /> ,Temperature; pH and conductivity of the purge water.'were measured at,regular intervals using an ' t <br /> ICM wafer,analyzer. The measurements:iu,ere,recorde'd on field logs. The percent-dissolved oxygen, <br />'. was measured in the;f nal tpurged water of each well'. Stabilization'data and field sheets are included <br /> in Appendix A.The"purged water'was placed-in DOT-approved drums•and was stored on site. <br /> Advanced Geo nVironmertal,inc " <br />