Laserfiche WebLink
. 20 October 2004 <br /> AGE-NC Project No 95-0109 <br /> Page 5 of 5 <br /> 5.0. RECOMMENDATIONS <br /> Based upon data collected from the site, AGE recommends <br /> • Continued quarterly ground water monitoring as required by Clean-up and Abatement Order <br /> No 93-701 The next groundwater monitoring event will be scheduled for December 2004 <br /> • Implementation of a six-month ozone injection pilot remediation feasibility study around the <br /> former dispenser area and east to well MW-14 as approved by the Board AGE anticipates <br /> the pilot study will be implemented by 15 October 2004 <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon field <br /> measurements and analytical results provided by an independent laboratory Evaluations of the <br /> geologic/hydrogeologic conditions at the site for the purpose of this investigation are made from a <br /> limited number of available data points(i e ground water samples) and subsurface conditions may <br /> vary away from these data points No other warranty, expressed or implied, is made as to the <br /> professional interpretations, opinions and recommendations contained in this report <br /> Advanced GeoEnvironmental,Inc <br />