Laserfiche WebLink
--- �i M M M _ — _ _ an = _ <br /> 7— Now <br /> Now <br /> EAST PINE STREET EAST PINE STREET <br /> + MW-6 <br /> <0 5 <br /> MW-10 <br /> <0 5 <br /> Z <br /> W <br /> MW-5<05 <br /> x <br /> O +MW-14 <br /> a 18 <br /> W MW_l <0 5 <br /> 32 <br /> MW-4 j-j <br /> x <br /> 061 <br /> E"a FORUM PENSM ISLAND LOCATION <br /> O <br /> E <br /> I MW-3 <br /> +<05 <br /> FORUM LIST LOCATION <br /> W-1 <br /> 05 <br /> MW-11 <br /> <0 5 MW-9 <br /> 45 MW--8 MW-7 <br /> <50 + <05 <br /> EAST OAK STRE <br /> EAST OAK STREET <br /> v <br /> MW-12 <br /> <0 5 ALLEY <br /> MW-13 ALLEY <br /> <0 5 <br /> CPT-3 +MW-16 <br /> <05 <br /> RESIDENTIAL PROPERTY <br /> 30 JUNE 2003 <br /> 121 CHEROKEE <br /> EAST WALNUT STREET <br /> LEGEND <br /> 18 -14*MONITORING WELL LOCATION AND BENZENE CONCENTRATION (UG/L) <br /> <06 BELOW LABORATORY REPORTING LIMI'T'S <br /> I <br /> — EXTENT OF DISSOLVED BENZENE <br /> ■ EXTRACTION WELL LOCATION <br /> ®EXISTING BUILDING <br /> Samples collected from wells MW1 through MWB, MW10, MW11, MW13 and EW-1 were collected 1n December 2002 <br /> N <br /> 0 sCsoo 120 APPROXIMATE EXTENT OF DISSOLVED BENZENE ,4dvanced <br /> FEET GEWEKE GeoEnvironmental, Inc. <br /> 16 SOUTH CHEROKEE LANE I o..WYA"n <br /> LORI, CALIFORNIA PROJECT NO AGE—NC-85-0109 tDFAWNE <br /> EMAC <br /> O P1DATE 15 JULY 2003 <br />