My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001718
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
16
>
2900 - Site Mitigation Program
>
PR0522479
>
ARCHIVED REPORTS XR0001718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 3:00:55 PM
Creation date
5/17/2019 2:37:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001718
RECORD_ID
PR0522479
PE
2957
FACILITY_ID
FA0015299
FACILITY_NAME
GEWEKE LAND DEVELOPMENT & MARKETING
STREET_NUMBER
16
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04323013
CURRENT_STATUS
01
SITE_LOCATION
16 S CHEROKEE LN
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Yr <br /> Quarterly Report - First Quarter 2003 <br /> GEWEKE LAND DEVELOPMENT & MARKETING <br /> 16 South Cherokee Lane, Lodi, California <br /> 1.0. INTRODUCTION AND SCOPE OF WORK <br /> At the request of Geweke Land Development & Marketing (GLDM), and in accordance with <br /> Cleanup and Abatement Order No 93-701,Advanced GeoEnvironmental,Inc (AGE)has prepared <br /> this report of environmental activities performed at 16 South Cherokee Lane,Lodi,California during <br /> the first quarter of 2003 The scope of work included quarterly ground water monitoring of wells <br /> MW-7, MW-8, MW-9, MW-12 and MW-14 through MW-19 The site and its surroundings are <br /> illustrated on Figure 1 Monitoring well and boring locations related to the site are shown on <br /> Figures 1 and 2 <br /> Results of previous investigations are detailed in the Problem Assessment Report (PAR), the <br /> I Quarterly Report-March 1996 and the Quarterly Report-March and June 1999 Analytical results <br /> for ground water samples from previous monitoring events are included in Table 3 of this report <br />' 2.0. PROCEDURES <br /> I Twenty on-and off-site monitoring wells were monitored for depth to water and ten on-and off-site <br /> monitoring wells were purged and sampled in March 2003 Field work was performed in accordance <br /> with San Joaquin County Environmental Health Department(EHD)guidelines for sampling ground <br /> Iwater monitoring wells and Central Valley Regional Water Quality Control Board (CVRWQCB) <br /> guidelines for investigations of underground storage tank (UST) sites <br /> 21 WELL MONITORING AND PURGE PROCEDURES <br /> IA Solmst water level meter was used to measure the depth to ground water to the nearest 0 01-foot <br /> ' in all twenty wells relative to the tops of the well casings The ground water elevation in each well <br /> was calculated by subtracting the depth to ground water from the surveyed well casing elevation <br /> (Table 1) <br /> After water levels were measured,wells MW-8,MW-9,MW-12 and MW-14 through MW-19 were " <br /> purged using a Watera Hydrolift Pump,well MW-7 was purged using a dedicated,disposable bailer <br /> Between 6 5 and 12 gallons of water(a minimum of 3 casing-water volumes per well)were purged <br /> from wells MW-7, MW-8, MW-9, MW-12, MW-14, MW-15, MW-16 and MW-19 and <br /> approximately 30 gallons removed from MW-17 and MW-18 <br /> Advanced Geo Environmental,Inc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.