Laserfiche WebLink
a, - •mss ,,.e PitC70, <br /> :• 1 .. - x ice• - : °o ,i..I , '....;,„,. <br /> 21,•October 1996 . <br /> AGE=NC-• <br /> Page 2 of 6. . <br /> ' I f <br /> -not:puirged; on 17 July I996..On.17 September l'996,'regular quarterlynionitoring activities,were�.- <br /> ;performe"d-at the'site,4hich also-included,MW-14-and EW-1. .As'during recent past monitoring <br /> k. event.s;:wells MW-1through M-W-5,did notcontain enough water for sampling., i T, <br /> s <br />' r 2.2.1. MONITORING WELL-PURGE PROCEDURES <br />' On 17 September 1996; a.Solinst'water level'meter was:used to measure the depth to ground water <br /> _-in eachmonitoring well..(Table 4). -Monitoring well EW-1�was;purged.using.a.2-inch 'submersible- <br /> pump. Monitoring wells'MW-6 through iY1W-14 were-purged:using clean PVC bailers A'minimum r <br /> of-three well volumes.of water'were removed"Trom eacliWell. <br /> Temperature, pH and:"conductivity of,the purgg water.were measured at,approximately 1-gall6n, f <br />'. intervals (10- allori ,intervals for-EW-1 rusin aTCM water anal zen--Dissolved oxygen wa <br /> g ) gn.. Y Y� s . <br /> measured in each well during purging. Monitoring well stabilization.data and field, sheets are , <br /> included.in'Appendix'X Tl e purge:water wasplaced in DOT.-approved druiris:and'stored 6'n'-site. <br /> lip2.2.2. ' 'COLLECTION OF GROUND WATER SAMPLES <br /> .Water samples were.callected from each`purged well,using'disposable plastic'bail'ers,,Inimediately <br /> upon retrieval, the samples.were transferred into,40-ml EPA vials containing hydrochloric acid as ' <br /> a preservative and were-transported in a chilled container to McCampbel1.Analytical, lnc. (MAI)..' ` <br /> Sarmple's were analyzed-for TPH-g and'BTE&X in,accordance with-EPA methods 5030/8015m, and <br /> „r <br /> 602, respectively.�Samples from MVL1=7, MVT -'8, MViW-9; MW-1y2,MW`17 ; MW�,1'4,and EW-1 were <br /> • also.analyzed-for volatile halocarbons in accordance;with EPA method 601. -The sample from MW <br /> 14 was also analvzed for ethylene.dibromide '(EDB} in accordance,with EPA rimethod 601'. <br /> SOIL GAS.MONITORING ; <br /> Seven remed"Wionwells (VW=1 through VW-7), three dry monitoring wells (MW,-3 through'MW <br /> r5), and MW44 are connected to a low-pressure blower that provides oxygen in'air to the subsurface, ' <br /> The.blower'is commonly turned off.forl'activities associated,with the business located at the-site. = <br /> On'17 July 1996, thepercentages of oxygen and carbon dioxideiin the soil..gas of the vadose zone <br /> were: nieasured.'usirig a GasTech OZ/COi: _analyzer as Feld 'instrumentation. Organic vapor, <br /> concentrations in the soil'gas,were measured in- artsper million using-,a photo=ionization detector <br /> (PID): ' <br />