Laserfiche WebLink
YD T{ <br /> .I <br /> Mr. Kenneth Earnest <br /> Ultramar, Inc. <br /> ' December 20, 1995 <br /> Page 2 <br /> During Delta's review of the Closure Report, an error was discovered with the positioning of the <br /> mechanical information on cross section A-A' and B-B'. Corrections were made and the revised <br /> sections are attached. <br /> Remarks/SignatuM <br /> The interpretations contained in this report represent our professional opinions,and are based in part, <br /> on information supplied by the client. These opinions are based on currently available information <br /> and are arrived at in the accordance with currently accepted hydrogeological and engineering practices <br /> at this time and location. Other than this, no warranty is implied or intended. <br /> If you have any questions, please contact me at (916) 638-2085. _ <br /> Sincerely, <br /> DELTA ENVIRONMENTAL <br /> N <br /> 4DOwen M. Kittredge, R.G. <br /> California Registered Geologi 853 q <br /> OMK (Cr.OMCAC) LIQ <br /> Enclosures <br /> Updated Figure 6 from Delta's Site Closure Evaluation Report dated June 1, 1995 <br /> Cross section C-C' and updated Figure 3 from Delta's Site Closure Evaluation Report <br /> dated June 1, 1995 <br /> Figures A and B. <br /> Mass volume calculations from Delta's Site Closure Evaluation Report <br /> Table 1, Summary of vapor extraction at Beacon Station No. 502. <br /> EVAX Technologies, Inc. report dated September 21, 1989 <br /> Updated Figure 4 from Delta's Size Closure Evaluation Report dated June 1, 1995 <br />