Laserfiche WebLink
1.k . <br /> 1 <br /> PROJECTED PROJECT11D PROJECTED <br /> SB-2 SB-3 SB-1 <br /> SOIL SOR3 SOIL BORING SOIL BORING <br /> MW-5 -2 -B -7 h W-3 MW-1 <br /> O <br /> 1 I \ <br /> CL fTLL I I \ <br />' <br /> GC I I sM <br /> I GP TANK BASIN I ML I SILTY SM \\ TANK BASIN IP TANK BASIN <br /> SM I THCV-930 I SAND <br /> AND \\ <br /> THCE-500 <br /> CRAVn B-ND SILTY SAND \ <br /> 514 TY SAND I T-ND I SAND \ <br />' 10 SM AND %WD I E-NA I ANO <br /> SP I X-49 SAND SP SP \ <br /> S-3 S-4 \ <br /> I ■ /■ \ <br /> CL CLAY I THC/-48�THPV]90 I ML SILT SLI \\ <br />' ML I THCE-11 ir-$ 0 \ ML <br /> SM SILT ML <br /> O-ND C NO� � ML SILT I <br /> SC CLAYEY SAM I T-ND 4,8 { <br /> TC- E-NA T}lCV 1700 SM <br /> 20 THCV-0.8 B-ND I X-ND 2 THtE-j90 I MLOy_p_9 ML 8-ND THCV-0.B 8-ND \ <br /> THCE-ND T-0.3 THCE--ND CL T-0.3 THCE-ND T-0.3 <br />' <br /> SILNt <br /> Sw TY SP X-ND�AND E-NID -� I X- I ML I ___X-ND X-ND�� \ <br /> x 1 \ <br /> 4 SAND 5P \ <br /> ML I CL I CL CL \\ <br /> SM I LAY CL CLAY \ <br /> CL CLAY \ <br /> I CL30 <br /> \ <br /> CLAY AND I CL \\ <br /> SILT SILT MH I I I \ <br />' = SM ; sw <br /> I SW ML � THCV-1.2 8-ND 1•HCV-0.9 B--ND� I \\ <br /> ML I I I THCE--ND ML T-0.4 THCE-ND T-0.4 \ <br /> o I E-ND E-ND \ <br /> SM I X-ND X-ND \ <br /> I <br /> 40 THCV-ND5P B-ND THCV-0.8 --B-ND SP SA 8-0.47 I CV-O., ML B-ND SM THCV-0.85 $� 9-0.47 \\ <br /> THCE-NA T-ND THCE-ND T-0.3 THCE-NA T-0.08 CE- T-ND THCE-NA T-OA8 <br /> E-ND E-ND E-ND E ND I E-NO \ <br /> Sw X--ND X-ND I X-ND X--NDI} X-ND \ <br />' I TD-41.5' I 1.5 TD 1.5' \ <br /> \ I <br /> SID AND SAND 1 I SP \\ <br />' so L SP SAND�vuy �DD L <br /> SP SAND AND <br /> SC SILTY SAND <br /> SAND <br /> CLAYEY <br /> ` ML <br /> Ll SILT <br /> TD-Bt' TOrBt' 7pag1• SM <br />' 10 FT <br /> LEGEND: 7HVC TOTAL HYDROCARBONS (VOLATILE) FIGURE 4 <br /> THCE TOTAL HYDROCARBONS (EXTRACTABLE) u <br /> ASPHALT AND AGGREGATE BASE B BENZENE GEOLOGIC CROSS SECTIONS A—A' & B---B' <br /> SM USCS SYMBOL T TOLUENE <br /> BEACON STATION N0. 502 <br /> APPROXIMATE CONTACT BETWEEN SOIL TYPES E ETHELBENZENE o <br />' SOIL SAMPLE LOCATION X XYLENES VERTICAL SCAM 35 NORTH CHEROKEE LANE <br /> ND NOT PRESENT OR BELOW METHOD DETECTION LIMITS <br /> SCREENED INTERVAL NA NOT ANALYZED LODI CA. <br /> 0 20 Fr P ECT NO. DRAWN BY <br /> TD TOTAL DEPTH SOIL SAMPLE ANALYSIS RESULTS IN MILLIGRAMS PER KILOGRAM (mg/Kg) 3-907 1.}L 522 95 <br /> FI Deft <br /> APPROXIMATE VERTICAL EXTENT OF SOIL CONTAINING PETROLEUM I 3N907-2 P REECARED BY EnvI <br /> C' /� HYDROCARBONS >100 mg/Kg PRIOR-TO SITE REMEDIATION I HORMONTAL SCALE ON NO. REyV By Cormunants6 Inc.-L , 2 /t'C� Consuita►rts. l <br /> 1 <br /> ;1 <br />