Laserfiche WebLink
SUBSURFACE INVESTIGATION REPORT <br /> Beacon Station No. 502 <br /> 35 North Cherokee Lane <br /> Lodi, California <br /> Delta Project No- 40-42-813 <br /> Page 4 <br /> 5.0 RECOMMENDATIONS <br /> Removal and replacement of the underground fuel storage tanks, product distribution piping, and <br /> dispensers, is tentatively scheduled to begin in August 1993. Delta recommends that soil in the vicinity <br />' of soil boring SB-3 which contains petroleum hydrocarbons be excavated and removed from the site. Soil <br /> samples should be collected from the bottom and sidewalls of the excavation and submitted for laboratory <br />' analyses of BTEX, TPH as gasoline, and TPH as diesel. Upon confirmation of remediation of site soils, <br /> Delta recommends regulatory closure of the site. <br /> 6.0 REMARKS/SIGNATURES <br />' The recommendations contained in this report represent our professional opinions and are based in part <br /> on information supplied by the client. These opinions are based on currently available information and <br />' are arrived at in accordance with currently accepted hydrogeologic and engineering practices at this time <br /> and location. Other than this, no warranty is implied or intended. <br /> DELTA ENVIRONMENTAL CONSULTANTS, INC. <br />' PREPARED BY: <br /> 1 eZ4 �� <br /> Richard E. Chandler Date <br />' Project Hydrogeologist/Manager <br /> E° G�4 <br /> ��'NCOtis eRO�<o�� <br /> 1 � <br /> r <br /> This report was prepared under the supervi r J~xP Na. 5078 8 <br /> of a California Registered Geologist: <br /> T� CALIf0 <br /> j?/�1 <br /> i� <br /> Y R. Brown , R.G. Date <br /> b" lfornia Registered Geologist No. 5078 <br /> RFT 103.S!H <br />