My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001788
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
3500 - Local Oversight Program
>
PR0544475
>
ARCHIVED REPORTS XR0001788
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 3:34:24 PM
Creation date
5/17/2019 3:29:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001788
RECORD_ID
PR0544475
PE
3528
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SHELL) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
02
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ist Quarter 1993 SVES Report, Beacon #502 Lodi <br /> Since the inception of the program in 1991, a significant amount of contamination has <br /> been removed from the subsurface with the program surpassing the 635 pounds extracted <br /> mark during the 1st Quarter 1993. <br /> The concentration of benzene to Total Petroleum Hydrocarbons as gasoline (TPHg) <br /> averaged 0.2 percent for the quarter. <br /> I The system operated 29 of a possible 29 days. This equates to an operation efficiency of <br /> 100 percent. <br /> Benzene emission were non-detectable for the quarter. The permit conditions limit <br /> emission discharge rates to 0.20 lb./day. <br /> II. INDIVIDUAL MONITORING EVENTS <br /> The following section describes how the SVES was adjusted within the performance and <br /> compliance limits of the system during each monitoring. <br /> 11 January 1993 Monitoring: <br /> The system operated continuously since 28 December 1992. Monitoring was performed <br /> on extraction points. Extraction points with Total Volatile Hydrocarbons (TVIT) <br /> concentrations of 150 parts per million volume/volume(ppmv) and greater were open to <br /> the system vacuum. <br /> 25 January 1993 Monitoring: <br /> The system operated continuously since 11 January 1993. Monitoring was performed on <br /> influent, effluent, and extraction points. Extraction points with TVH concentrations of <br /> 115 ppmv and greater were open to the system vacuum.. <br /> 5 February 1993 Shutdown: <br />' System was shutdown for confirmation borings. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.