My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001791
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
3500 - Local Oversight Program
>
PR0544475
>
ARCHIVED REPORTS XR0001791
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 3:40:59 PM
Creation date
5/17/2019 3:29:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001791
RECORD_ID
PR0544475
PE
3528
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SHELL) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
02
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! Ultramar <br /> Ultramar Inc. Telecopy: 209.584-6113 Credit&Wholesale <br /> P,O.Box 466 209-583-3330 Administrative <br /> 525 W.Third Street 209-583-3302 Information Services <br /> Hanford,CA 93232-0466 209-583-3358 Accounting <br /> (209)582-0241 <br /> ENVIRONMENTAL PROJECT <br /> QUARTERLY STATUS REPORT <br /> DATE REPORT SUBMITTED: February 8, 1993 <br /> QUARTER ENDING: December 31, 1992 <br /> SERVICE STATION NO. : 502 <br /> ADDRESS: 35 North Cherokee Lane, Lodi , California <br /> COUNTY: San Joaquin <br /> ULTRAMAR CONTACT: Kenneth R. Earnest TEL. NO: 209-583-5571 <br /> BACKGROUND: <br /> Five (5) ground-water monitoring wells and four (4) vapor <br /> is extraction wells have been installed on the site. <br /> In September of 1986 one single wall underground storage tank <br /> (UST) was excavated and replaced with a double wall UST. The <br /> other two (2) UST's were lined at this time. <br /> Permitting for the vapor extraction system was completed and <br /> the vapor extraction system was installed late in the third <br /> quarter 1992. <br /> SUMMARY OF THIS QUARTER'S ACTIVITIES: <br /> Groundwater monitoring was performed on October 29, 1992. <br /> RESULT OF QUARTERLY MONITORING: <br /> Only MW-3 contained enough water to sample and it was not <br /> detect for TPH-g and BTEX. <br /> PROPOSED ACTIVITY OR WORK FOR NEXT QUARTER: <br /> ACTIVITY ESTIMATED COMPLETION DATE <br /> First quarter groundwater monitoring February 1993 <br /> End vapor extraction February 1993 <br /> Drill confirmation borings for site closure February 1993 <br /> i A Member of the Ultramar Group of Companies #1 Quality and Service <br /> Ulfivamae <br />
The URL can be used to link to this page
Your browser does not support the video tag.