Laserfiche WebLink
NOTE' l <br /> THIS PLAN WILL BE USED FOR UTILITY LOCATE a- <br /> IN FRONT OF THE STATION AND ACROSS ALL <br /> LANES OF TRAFFIC.ONE STATION DRIVEWAY 1 < <br /> WILL REMAIN OPEN AT ALL TIMES.EAST AND _ de a LL <br /> WEST BOUND TRAFFIC WILL BE DONE SEPARATE w:i p <br /> AS WELL. <br /> �N20-4 00 <br /> in <br /> sa(CA) <br /> DRIVEWAY OPEN Da,mWA OPEN BE ry(V.-A two-, <br /> .......... TO *1 <br /> IKAe W -4 C9 (CA) W -4 <br /> PATTERSON PASS RD.� <br /> 777 <br /> ,r. <br /> �- .:. <br /> R01D TO <br /> ware <br /> AWAo W C9 (CA) W -4 <br /> 0-4 <br /> W 0-1 <br /> POSTED SPEED:55 MPH TAPER LENGTH: 660' CONE SPACING: 50' SIGN SPACING: 5550' BUFFER ZONE 495' ow—'. <br /> c� CITY OF TRACY <br /> M WORK ZONE . LIGHT TOWER Project Name: <br /> ■� CERTIFIED FLAGGER `f BARRICADE FORMER ARCO NO.JOB#GP09BPNA.C178 <br /> Prime Contractor: <br /> LICENSE#975518 �- REFLECTIVE CONE SAND FILLED CRASH CUSHION ARCADIS <br /> Adam Bennett TEMPORARY C.A.S. ABSORB 350 ELEMENT <br /> Phone Number: ale rapara <br /> (916)452-485 — 916-786-5213 5/17/2018 <br /> ® ARROW BOARD 1r WATER WALUWATER FILLED K RAIL y Project Sheet 0: <br /> CHANGEABLE MESSAGE SIGN 20' CONCRETE K RAIL repared Joe <br /> C SAFFM&JiMilkilfill #1964 <br />