Laserfiche WebLink
!R!PSRC100;EXIT; !R!MTYP99,—XIT; !R! spsz6;stm0;exi-t; <br /> Daily Inspection Log For Tank Systems <br /> By initialing in the box below I certify that I have conducted an inspection in accordance with 22 CCR Section 66265.195(a). <br /> Specifically this inspection included inspection of the following items: a <br /> 1) Overfill/spill control equipment <br /> 2) Aboveground portions of the tank system to detect con-osion or releases of waste <br /> 3) Data gathered from monitoring equipment and leak detection equipment to ensure that the tank system is being operated <br /> according to its design; <br /> 4) The construction materials and the area immediately surrounding the externally accessible portion of the tank system including j <br /> secondary containment structures to detect erosion or signs of <br /> releases of hazardous waste. a <br /> 5) For uncovered tanks,the level of waste in the tank,to ensure compliance with section 66265.194(b)(3). <br /> 6) Label-legible and complete <br /> Jan. Feb. Mar. Apr. May June Jul Au . Se . Oct. Nov. Dec. <br /> 1 <br /> 2 — <br /> 3 <br /> 4 <br /> 5 <br /> 6 <br /> 7 <br /> 8 <br /> 9 <br /> 10 <br /> I1 — <br /> 12 <br /> 13 — <br /> 14 — <br /> 15 <br /> 16 <br /> 17 <br /> 18 <br /> 19 <br /> 20 <br /> 21 - <br /> 22 <br /> 23 <br /> 24 <br /> _ I _ <br /> 25 <br /> 26 - <br /> 27 <br /> 28 <br /> 29 -- - <br /> 31 31 <br /> Name of Person Responsible For Inspection: Inspection Year: <br />