My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 4:20:04 PM
Creation date
5/20/2019 9:20:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chronology <br /> 25775 Patterson Pass, Tracy <br /> Page 3 <br /> 04/24/92 PHS/EHD letter requesting log for on site well and depth to water in the well. <br /> 6/1-3/92 Borings B20-B25 drilled and completed as vapor extraction wells VW10-VW15. <br /> 11/20/92 Received report dated 11/12/92 of borings/vapor wells installed in June 1992. <br /> VW10 screen 10-30 feet VW11 screen 9.5-39.5 feet <br /> VW12 screen 10-25 feet VW13 screen 42-72 feet <br /> VW14 screen 9.5-29.5 feet VW15 screen 44-84 feet <br /> Deepest soil results and total depth: <br /> B20 ND at 51' TD B21 460 ppm TPH at 41.5' TD <br /> B22 350 ppm TPH at 26.5' TD B23 ND at 76' TD <br /> B24 200 ppm TPH at 31.5' TD B25 ND at 90.5' TD <br /> Well log for on site well. Artesian well 1800 feet southeast. Since groundwater <br /> not encountered at 115 feet, first water is below this level. Propose additional <br /> borings and vapor wells. Soil hauled to BFI by Dillard Trucking. <br /> 12/15-22/92 B26 through B28 drilled. B26 -B27 completed as vapor wells VW16-VW17. <br /> VW15 filled with cement from 65-85 feet. B26 drilling difficult (began on 12/14/92 <br /> with hollow stem auger to 85.5 feet, completed with air rotary to 110 feet on <br /> 12/22/92). <br /> 3/23/93 Received report of borings/vapor wells installed December 1992, dated 3/18/93. <br /> VW16 screen 20-40 feet VW17 screen 73-103 feet - contamination at 6 <br /> Deepest soil results and total depth: <br /> B26 .006 ppm Benzene at 110"TD <br /> B27 8800 ppm TPH at 40' TD <br /> B28 .018 ppm Benzene at 71' TD <br /> Soil from borings to be removed by Dillard Trucking. Further off site investigation <br /> proposed. <br /> 6/26 to B29 through B31 drilled and completed as vapor wells VW18-VW20. <br /> 7/5/95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.