My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 4:18:47 PM
Creation date
5/20/2019 9:20:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Field Practices and Procedures <br /> Page 2 <br /> samplers will be steam cleaned between each boring to reduce the possibility of cross <br /> contamination. Steam cleaning effluent will be contained in 55-gallon drums and <br /> temporarily stored on site. The disposal of the effluent will be the responsibility of the <br /> client. <br /> Soil Sample Collection <br /> During hollow stem auger drilling, soil samples will be collected in cleaned brass, two by <br /> six inch tubes. The tubes will be set in an 18-inch-long split-barrel sampler. The sampler <br /> will be conveyed to bottom of the borehole attached to a wire-line hammer device on the <br /> drill rig. When possible, the split-barrel sampler will be driven its entire length, either <br /> hydraulically or by repeated pounding a 140-pound hammer using a 30-inch drop. The <br /> number of drops (blows) used to drive the sampler will be recorded on the boring log. <br /> The sampler will be extracted from the borehole, and the tubes containing the soil <br /> samples will be removed. Upon removal, the ends of the lowermost tube will be sealed <br /> with Teflon sheets and plastic caps. Soil samples for chemical analysis will be labeled, <br /> placed on ice, and delivered to a state-certified analytical laboratory, along with the <br /> appropriate chain-of-custody documentation. Soil samples are not normally collected <br /> during air rotary drilling. <br /> Soil Classification <br /> Soil samples collected in brass tubes, or drill cuttings evacuated from the borehole during <br /> air rotary drilling, will be logged on site by a geologist using the Unified Soil <br /> Classification System. Representative portions of the brass sleeve samples will be <br /> retained for further examination and for verification of the field classification. Logs of <br /> the borings indicating the depth and identification of the various strata and pertinent <br /> information regarding the method of maintaining and advancing the borehole will be <br /> prepared. <br /> Soil Sample Screening <br /> Soil samples selected for chemical analysis will be determined from a head-space <br /> analysis using a PID or an FID. The soil will be placed in a Ziploc bag, sealed, and <br /> allowed to reach ambient temperature, at which time the PID probe will be inserted into <br /> the Ziploc bag. The total volatile hydrocarbons present are detected by the PID and <br /> reported in parts per million by volume (ppmv). The PID will be calibrated to an <br /> isobutylene standard. <br /> At least two soil samples retained from each soil boring will be submitted for chemical <br /> analysis unless otherwise specified in the scope of work. Soil samples selected for <br /> analysis typically represent the highest PID reading recorded for each soil boring and the <br /> sample just above first-encountered groundwater. Additional soil samples will be <br /> MAField Practices\Field P&P-With Air Rotary Drilling-revised 02-2005 by SGB.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.