My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 4:18:47 PM
Creation date
5/20/2019 9:20:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br /> 10 feet below first-encountered water level. The screened interval will allow for seasonal <br /> fluctuation in water level and for monitoring floating product. A threaded or slip PVC <br /> cap is secured to the bottom of the casing. The slip cap can be secured with stainless <br /> steel screws or friction; no solvents or cements are used. Centering devices may be <br /> fastened to the casing to ensure even distribution of filter material and grout within the <br /> borehole annulus. The well casing is thoroughly washed and/or steam cleaned, or may be <br /> purchased as pre-cleaned, prior to completion. <br /> A filter pack of graded sand will be placed in the annular space between the PVC casing <br /> and the borehole wall. Sand will be added to the borehole through the hollow stem of the <br /> augers to provide a uniform filter pack around the casing and to stabilize the borehole. <br /> The sand pack will be placed to a maximum of 2 feet above the screens, followed by a <br /> minimum 1-foot seal consisting of bentonite pellets. <br /> Cement grout containing 5 percent bentonite or concrete will be placed above the <br /> bentonite seal to the ground surface. A concrete traffic-rated vault box will be installed <br /> over the monitoring well(s). A watertight locking cap will be installed over the top of the <br /> well casing. Reference elevations for each monitoring well will be surveyed when more <br /> than two wells will be located on site. Monitoring well elevations will be surveyed by a <br /> California licensed surveyor to the nearest 0.01-foot relative to mean sea level (MSL). <br /> Horizontal coordinates of the wells will be measured at the same time. <br /> Exploratory boring logs and well construction details will be prepared for the final <br /> written report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.