Laserfiche WebLink
CONTROL EQUIPMENT DESC ION <br /> Type of Control [ ] Carbon Canisters [x] Catalytic Oxidizer [ ] internal Combustion <br /> (check all Engine (attach detailed <br /> applicableboxps)' Thermal Oxidizer [ ] Other: <br /> [ 1 specifications) <br /> Carbon Canis r4 Manufacturer: Model: <br /> (2 required in"fltg) Weight of Primary Canister: Ib Weight of Secondary Canister: Ib <br /> Each canister must be able to withstand 7 days of operation without breakthrough <br /> IC Engine Engine Manufacturer: Engine Model: <br /> (catalytic converter Type of Supplemental Fuel Used: Rating: <br /> requirod) [ ] Natural gas [ ]LPG/Propane BHI' <br /> Maximum Gasoline Consumption at Rated Power Output: gat/hr <br /> Emission Data (Prtnr ,AM—te. 02, dry: <br /> (Ifcofra s qsf� % was,Vltoz 'r % <br /> Nitrogen Oxides (as NO2) ppmvd <br /> Carbon Monoxide ppmvd <br /> Catalyst Manufacturer: Catalyst Model: <br /> Guaranteed Catalyst Efficiency % NOx % CO % VOC <br /> Thermal/Catalytic Manufacturer: 0\4 , Model: bA )E <br /> Oxidizer [ ] Natural gas MMBtu/hr [ ] LPG/propane MMBtu/hr [n] Electric q-S KVA <br /> Thermal must have a minimum 1400 IF and Catalytic must have a minimum of 600 OF <br /> A continuous temperature recording device or an automatic shutdown system is required <br /> ADDITIONAL INFORMATION <br /> Maximum length of project: 3YI KGs <br /> Stack gas temperature after control: 600 – 300 IF Stack gas velocity after control: v o fpm <br /> Stack height (include units): 1 0 FEET A&otee (,UvND Stack diameter (include units): 5 !Nr,HES <br /> Does the stack have a rain cap: [ ] Yes [XI No <br /> NearestRodAptor f ( ii9 ids, StPul9¢ F Otttti <br /> Offsite Business' SH ELL, NRiJ2'AL f�,/jS PLA r`i–j rJ <br /> 3, 960 <br /> Sensitive Receptor' QGsi1J ice '�j z, 64.0 <br /> 1. Examples of Offsite Business include but are not limited to office buildings, guard posts, and factories. <br /> 2. Examples of Sensitive Receptors include but are not limited to schools, day care centers, hospitals, apartments <br /> and other places of residence. <br /> 1. Attach a sketch of the equipment configuration. <br /> 2. Operating Schedule: 2 4 hours per day J- days per week SZ weeks per year. <br /> 3. Attach copies of lab results and equipment data sheets, including speciation profiles. <br /> 4. Completely fill out this form, all information submitted may become permit conditions. <br />