My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 4:18:47 PM
Creation date
5/20/2019 9:20:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> FIELD PROCEDURES <br /> Drilling Methods <br /> Before drilling begins, we will notify Underground Service Alert of our intent to drill so <br /> that approximate locations of underground utility lines and structures can be marked. The <br /> soil borings are started by hand-augering to a depth of 5 feet to minimize the possibility of <br /> damaging underground utilities. <br /> The borings are drilled with a mobile B-61 or similar drill rig equipped with 8-inch- <br /> outside-diameter by 4-1/4-inch-inside-diameter, continuous-flight, hollow-stem augers. <br /> The augers are steam-cleaned before use in each boring to minimize cross-contamination <br /> of the borings. The drill cuttings are stored in type 17-E, steel, 55-gallon drums or <br /> stockpiled on site and covered with plastic before disposal at an appropriate disposal <br /> facility. <br /> Soil Sampling in Borings <br /> Soil samples for analysis and identification are collected at approximately 5-foot intervals <br /> from the borings during drilling. Soil samples are collected by advancing the boring to a <br /> point just above the sampling depth, and then driving a California-modified, split-spoon <br /> sampler containing clean brass sleeves through the hollow center of the auger into the soil. <br /> The sampler is driven 18 inches with a standard 140-pound hammer repeatedly dropped <br /> 30 inches. The number of blows needed to drive the sampler each successive 6 inches is <br /> counted and recorded to evaluate the relative consistency of the soil. Sampling equipment <br /> is cleaned between each use with an industrial soap and clean tap water. <br /> The samples selected for laboratory analysis are removed from the sampler and promptly <br /> sealed in their brass sleeves with Teflon tape and plastic caps. The samples are labeled <br /> and promptly placed in iced storage for delivery to the laboratory. <br /> SAC\N:\PJO\0805\08051520.3AL-94Virt :I A-1 Rev.0.6/8/95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.