My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STONEBRIDGE
>
857
>
2200 - Hazardous Waste Program
>
PR0516001
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 10:41:33 AM
Creation date
5/20/2019 10:30:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516001
PE
2220
FACILITY_ID
FA0012415
FACILITY_NAME
Oakland Pallet Co.; Inc.
STREET_NUMBER
857
STREET_NAME
STONEBRIDGE
STREET_TYPE
DR
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
857 STONEBRIDGE DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oPqugY•c <br /> ENVIRONMENTAL HEALTH DtkARTMENT <br /> a: a <br /> C4�/FORa�P SAN JOAQUIN COUNTY <br /> Donna K. program Coordinators <br /> Director <br /> r 600 East Main Street, Stockton,California 95202 Kasey L.Foley,R.E.H.S. <br /> Telephone:(209)468-3420 Fax. (209)468-3433 Robert McClellon,R.E.H.S. <br /> Jeff Carruesco,R.E.H.S. <br /> Web:www.sjgov.org/ehd <br /> SITE HEALTH& SAFETY PLAN <br /> PART I PART II <br /> GENERAL SITE INFORMATION EVALUATION OF POTENTIAL HAZARDS <br /> 1. Site Name: 1. Chemicals Hazards <br /> Address: ❑Carcinogens: <br /> Contact Person: ❑Corrosives: <br /> Phone#: 3 � 2 ❑Dusts: <br /> Proposed Date of investigationhnspection: V,[o O xplosives: NGi�iY?, n 11 <br /> lammables: <br /> 2. Description and brief narrative of inspection activity: ❑Inorganic Gases: <br /> ❑New UST installation ❑UAR Investigation ❑Metals: <br /> ❑Tank Closure in Place ❑Tank/Pipe Repair ❑Oxidizers: <br /> ❑Tank/Pipe Removal ❑Re-excavation ❑PCBs: <br /> ❑Sampling ❑Boring/Monitoring Well installation ❑Other: <br /> Hazardous Waste inspection ❑Tiered Permitting inspection <br /> PART III <br /> 3. Specific Site Information: REQUIRED PERSONAL PROTECTIVE EQUIPMENT <br /> Tank No.: Tank Capacity: 1. Monitoring Equipment(Note:Monitoring instruments must be used for all <br /> Tank Content: Tank Age: operations unless appropriate rationale or restrictions are provided): <br /> Other: ❑Combustible Gas/Oxygen Meter <br /> �� <br /> F-1DetectorTubes(specify): <br /> 4. Type of Operation:� Xil'L ❑Photo ionization Detector <br /> ❑Organic Vapor Analyzer <br /> 5. Release History: ❑Other(specify): <br /> Evidence of leaks/soil contamination: ❑YES ❑NO None(see below) <br /> Documented Groundwater contamination: ❑YES ❑NO If monitoring instruments are not used,rationale or activity/area restrictions: <br /> Background and description of any previous investigation or incidence: <br /> 2. Personal Protective Equipment <br /> 6., Potential Health&Safety Physical Concerns:(✓all that apply&describe) Level of Protection: ❑A ❑B ❑C OD <br /> ❑Heat or Cold Stress: °F(high ambient temp.) E Hard Hat <br /> IOoise Sources: E Safety Glasses/Goggles <br /> N <br /> [I Oxygen Deficiency: E Steel toed/shank shoes or boots <br /> ElExcavation(falls,trips,slipping,cave-ins): El Flame retardant coveralls <br /> andling and Transfer of a Hazardous Substance(fire,explosions,etc.):. E Hearing protection <br /> PI <br /> ❑Tyvek <br /> ❑Confined space entry(explosions): ❑Respirator: ❑APR ❑SCBA <br /> Heavy equipment(physical injury&trauma resulting from moving A/P Cartridge: <br /> equipment): E Safety vest <br /> ❑Other(specify): Two-way communication cob <br /> Other(specify): <br /> 7. Anticipated Biological Hazards: <br /> ❑Snakes X <br /> Insects Rodents ❑Poisonous Plants PART IV <br /> ❑Other/Unknown(specify): PLAN APPROVAL <br /> 8. Narrative(provide all information which could impact Health and Safety, Plan Prepared b Date: <br /> e.g.,power lines,integrity of dikes,terrain,etc.): 11 <br /> Plan Approved by: y A Date: L4 ��`ye <br /> '23081(4/7/2010) <br />
The URL can be used to link to this page
Your browser does not support the video tag.