My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 1:52:10 PM
Creation date
5/20/2019 1:44:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
URS <br /> Mr. Harlin Knoll <br /> San Joaquin County Environmental Health Department <br /> August 6,2002 <br /> Page 2 <br /> Sampling Procedures <br /> Confirmation Samples <br /> A backhoe bucket of native soil will be collected from each sample location and rapidly brought to the <br /> surface. Approximately three inches of soil will be rapidly scraped away from the surface, and a clean brass <br /> tube (at least three inches long) will be driven or pushed into the soil. Once the tube is filled with soil, the <br /> ends will be covered with Teflon tape and plastic end caps. Once properly sealed, the sample will be <br /> labeled, logged onto the chain-of-custody document, placed into an individual resealable plastic bag, and <br /> placed on ice in an insulated cooler, pending shipment to Sequoia Analytical Laboratories in Sacramento, <br /> California,for analysis. <br /> Stockpile Samples <br /> Samples will be collected from random locations throughout the stockpile. At each location, approximately <br /> 3 inches of soil will be scraped away from the surface of the stockpile prior to sample collection. Samples <br /> will be collected following the same procedures as the confirmation samples. <br /> Sample Analysis <br /> Samples will be analyzed within the appropriate holding times. Turn-around times for sample analysis will <br /> be determined in the field. Samples will be analyzed for the following: <br /> • Total petroleum hydrocarbons as gasoline (TPHg) by U.S. Environmental Protection Agency <br /> (EPA)method 8015M. <br /> • Benzene,toluene,ethylbenzene,and total xylenes(BTEX)by EPA method 8021. <br /> • Methyl tert-butyl ether(MTBE), tert-butyl alcohol (TBA), di-isopropyl ether(DIPE), ethyl tert- <br /> butyl ether(ETBE),and tert-amyl methyl ether(TAME)by EPA method 8260B. <br /> • Total lead by EPA method 6010B (stockpile samples,only). <br /> Report Preparation <br /> At the completion of the field activities, a UST closure report will be prepared. Included in this report will <br /> be a summary of the overexcavation activities, the results of the confirmation sampling, and a discussion of <br /> the soil stockpile disposal. <br /> If you have any questions or comments,please call me at(916)679-2299. <br /> Sincerely, C ?ED GEO� <br /> URS Corporation Americas �� �oN PAUL F�9�G'id,� <br /> s <br /> No. 7120 <br /> Vernon Elarth,R.G.7120 Exp. <br /> Project Manager �Q. <br /> s <br /> SL/hr OF CAS-����� <br /> cc: Mr.Paul Supple,Atlantic Richfield Company <br /> Mr.Marty Hartzell,RWQCB,Central Valley Region <br /> K:U5 BP ARCO\00434\UST Removal\WorkPlan.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.