Laserfiche WebLink
'qFcoR �I <br /> Work Plan for Soil and Groundwater "'stigation <br /> Former ARCO Service Station#0760 <br /> December 13,2006 <br /> Page 6 <br /> Surveying <br /> Following installation,the newly installed groundwater wells and vapor probes will be surveyed by a <br /> licensed surveyor. The survey data including elevation (not for vapor probes), longitude, and <br /> latitude will be referenced to a local benchmark relative to mean sea level. Survey data will be <br /> included in information uploaded to the State Water Resources Control Board (SWRCB)Geotracker <br /> database in accordance with Assembly Bill (AB) 2886 requirements. <br /> Compliance with AB 2886 Requirements <br /> Also per AB 2886 requirements, SECOR will electronically upload the data obtained during this <br /> investigation into the SWRCB Geotracker Database. <br /> Soil and Water Disposal <br /> Soil cuttings,decontamination water,and purge water generated during well installation activities will <br /> be stored temporarily onsite in California Department of Transportation (DOT)-approved, 55-gallon <br /> steel drums pending characterization and disposal. Once profiled, the drums will be removed from <br /> the Site and disposed of at an appropriate disposal facility. <br /> Report <br /> Following the completion of well installation activities, SECOR will submit a report documenting the <br /> findings. The report will include soil boring logs, soil, groundwater, and vapor analytical results, <br /> chain-of-custody documentation, conclusions, and recommendations for future work if needed. <br /> SECOR Standard Field and Laboratory Procedures are including in Attachment B. <br /> ARCO 00760 Soil and Groundwater Investigation WP.doc <br />