My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 1:52:10 PM
Creation date
5/20/2019 1:44:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'qFcoR �I <br /> Work Plan for Soil and Groundwater "'stigation <br /> Former ARCO Service Station#0760 <br /> December 13,2006 <br /> Page 6 <br /> Surveying <br /> Following installation,the newly installed groundwater wells and vapor probes will be surveyed by a <br /> licensed surveyor. The survey data including elevation (not for vapor probes), longitude, and <br /> latitude will be referenced to a local benchmark relative to mean sea level. Survey data will be <br /> included in information uploaded to the State Water Resources Control Board (SWRCB)Geotracker <br /> database in accordance with Assembly Bill (AB) 2886 requirements. <br /> Compliance with AB 2886 Requirements <br /> Also per AB 2886 requirements, SECOR will electronically upload the data obtained during this <br /> investigation into the SWRCB Geotracker Database. <br /> Soil and Water Disposal <br /> Soil cuttings,decontamination water,and purge water generated during well installation activities will <br /> be stored temporarily onsite in California Department of Transportation (DOT)-approved, 55-gallon <br /> steel drums pending characterization and disposal. Once profiled, the drums will be removed from <br /> the Site and disposed of at an appropriate disposal facility. <br /> Report <br /> Following the completion of well installation activities, SECOR will submit a report documenting the <br /> findings. The report will include soil boring logs, soil, groundwater, and vapor analytical results, <br /> chain-of-custody documentation, conclusions, and recommendations for future work if needed. <br /> SECOR Standard Field and Laboratory Procedures are including in Attachment B. <br /> ARCO 00760 Soil and Groundwater Investigation WP.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.