My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012750
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0012750
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:54:46 PM
Creation date
5/20/2019 1:51:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012750
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�y'°$u 4� 'e^, .. ra..4 ��'�'.. 5 _ L N , ,n t'y Np,•- 7Cr � q^ !i, <br /> 4 <br /> e <br /> ApPlIed GeoSystems 41914 P(3%%Vr Istn Road,Sacranu•nto,CA 95826 1976)452-2901 <br /> e FREMONT •IRVINE • HOUSTON • BOSTON •SACRAMENTO •CULVER CITY o SAN LOSE <br /> June 13, 1991 <br /> AGS 38048-6W <br /> Mr. Chuck Carmel <br /> ARCO Products Company <br /> P.O. Box 5811 <br /> San Mateo, California 94402 <br /> Subject: Addendum to Work Plan for a Subsurface Investigation at ARCO Service <br /> Station No. 760, 225 South Cherokee Lane, Lodi, California. <br /> Mr. Carmel: <br /> At the request of ARCO Products Company (ARCO), App!ied GeoSystems, <br /> Inr../RESNA Industries (Applied GeoSystems) is submitting this addendum to our <br /> previous Work Plan No. 38048-3W, dated April 23, 1990, and Results of Initial <br /> Investigation and Work Plan for Excavation During Tank Replacement, Report No. <br /> 38048-4, dated December 18, 1990. Additional work to be conducted during tank <br /> replacement includes monitoring the removal and replacement of the underground <br /> storage tanks. The purpose of the work is to evaluate whether hydrocarbons are <br /> affecting native soil underlying the site and to assist ARCO and their contractors in <br /> complying with local permitting for underground storage tank replaca-ment.. No remedial <br /> activities wwi'] be conducted during the removal and replacement of the tanks.� ARCO <br /> ' Service Station No. 760 is located on the northwest corner of South Cherokee Lane and <br /> Lodi Avenue in Lodi, California, as shown on the Site Vicinity Map (Plate P-1). <br /> A representative of Applied GeoSystems was at the site in May 1990 to observe drilling. <br /> of three soil borings near the former waste-oil tank cavity. We returned to the site in <br /> October 1990 to observe the drilling of five additional soil borings near t11e existing and <br /> proposed gasoline tank cavity. locations of the borings are'ihown on the Generalized <br /> Site Plan (Plate P-2). Results of the October 1990 investigatlu;r::_dicated residual <br /> gasoline hydrocarbons were not detected in the soil sample collected from borings <br /> around the perimeter of the existing tank cavity or near the proposed tank cavity in <br /> concentrations that warrant remediation. However, hydrocarbons may be present in soil <br /> underlying the existing underground-storage tanks. <br /> j <br /> t'i <br />
The URL can be used to link to this page
Your browser does not support the video tag.