Laserfiche WebLink
Addendum to Work Plan lune 13, 1991 <br /> ARCO Station No. 760, Lodi, California AGS 38048-6W <br /> o Monitor backfill' :g of stockpiled backfill material removed from the old <br /> tank cavity back into the old tank cavity, provided authorization is obtained <br /> am from SJCPHS. Authorization from SJCPHS will be based on the analytical <br /> results of the composite samples collected from the backfill material. <br /> o Prepare a report summarizing our methods, interpretations, and <br /> conclusions. <br /> ARCO will arrange transportation of stockpiled soil from the new tank cavity to an <br /> appropriate facility for disposal. The work will be performed in accordance with the Tri- _ <br /> Regional Board Staff Recommendations for Preliminary Evaluation and Investigation of <br /> Underground Tank Sites (California Regional Water Quality Control Board, Central <br /> Valley Region, 1989); Appendix A to that docu': ent (August 1990); and the Leaking <br /> Underground Fuel Tank Manual (California Leaking Underground Fuel Tank Task <br /> Force, 1989). <br /> We recommend that a copy of this addendum be forwarded to Ms. Diane Hinson of the <br /> San Joaquin County Public Health Services, Environmental Health Division, 445 North <br /> San Joaquin, Stockton, California 95202. Please call if you have any questions regarding <br /> this worK plan. <br /> Sincerely, <br /> Applied GeoSystems, Inc. <br /> tERED G o RESNA Industr' <br /> Eloise K. Frick <br /> No.4313 / Pr ;ect Geologist <br /> CAa �Pl <br /> sr9f�ofi 10 i1 <br /> hn B. Bobbitt <br /> R G. 4313 <br /> Attachments: Site Vicinity Map, Plate P-1 <br /> Generalizcd Site Plan, Plate P-2 <br /> Field Methods <br /> 3 <br /> Applied GeOSYWOMS - <br /> . W <br />