My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012750
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0012750
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:54:46 PM
Creation date
5/20/2019 1:51:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012750
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F i <br /> Results of Initial Investigation and Work Plan December 18, 1990 <br /> ARCO Service Station No. 760, Lodi, California AGS 38048-4 <br /> m <br /> o Observe excavation of soil in and around the proposed gasoline-tank cavity <br /> to approximately 12 feet below grade. <br /> o Collect appropriate soil samples from the base of the proposed tank cavity to <br /> evaluate hydrocarbons, if present, in soil were removed by excavation. <br /> o Install a max:mum of six conductor casings in either tank cavity to allow soil <br /> borings to be drilled between the new tanks ai a later date,if soil containing <br /> greater than 10 ppm of TPHg and greater than 1.0 ppm benzene remains at <br /> the bottom of either tank cavity after the safe operating limits of the <br /> equipment is reached. <br /> o Collect and analyze one soil sample every 20 linear feet below the former <br /> product lines. <br /> o Observe excavation of soil in and around existing waste-oil tank until the safe <br /> operating limits of the equipment wdth respect to sidewall stability and the <br /> sidewall stability and surrounding structures are reached and submit <br /> appropriate soil samples. <br /> f,3 <br /> o Collect and analyze soil samples from the stockpiled so:!, evaluate disoosal <br /> options and apprise ARCO of the disposal options for the soil. <br /> o Submit soil samples associa.ted with the gasoline cavaties, to a State-certified <br /> laboratory for analysis of ITHg and BTEX. Soil samples collected from <br /> under the former leaded gasoline tank will be submitted for analysis of total <br /> and o%-Mc lead. 1'1r_ I` <br /> o Submit soil samples associated with the former waste-oil tank cavity to a <br /> State-certified l-.boratory for analysis of TPHg. HTEX, total petroleum <br /> hydrocarbons as diesel (TPHD), and total oil and grease (TOG). <br /> o Prepare a report summarizing tank removal operations and our findings, <br /> conclusions, and::•ccommendations. <br /> 4r <br /> 13 <br /> AP <br /> p/ied Ge0SYSMIM5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.