My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012750
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0012750
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:54:46 PM
Creation date
5/20/2019 1:51:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012750
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i+2 <br /> Results of Initial Investigation and Work Plan December 18, 1990 <br /> ARCO Service Station No. 760, Lodi, California AGS 38048-4 <br /> not excavated. ARCO will then evaluate remedial options based on the results of the <br /> delineation. <br /> REPORT PREPARATION <br /> We will prepare a report s<,mrnarizing our field methods,laboratory procedures,laboratory <br /> results, and conclusions. The report will also contain cross sections and maps (as <br /> appropriate) to illustrate sample Iocations and the extent of excavation. The report will be <br /> submitted to the SJPHS within 90 days of the completion of the field work. L ormation <br /> gathered will be considered confidential and released only with authorization of ARCO. <br /> PROJECT PERSONNEL. <br /> Mr.John Bailey Bobbitt,a Registered Geologist(R.G.4313)in the State of California,will <br /> be in charge of the project. Ms.Eloise Frick,Project Geologist,will manage field and office <br /> operations. Applied GeoSystems employs a staff of engineers, geologists, and technicians <br /> whose services will be used to see the project through to completion. <br /> REFERENCES CITED <br /> +� Applied GeoSystems. February 15, 1990.Site 5afe Plan. Plan No.38048-35. <br /> Applied GeoSystems.April 23, 1990.Work Plan: ion.Plan No. <br /> 38048-3W. <br /> California Department of Water Resources. 1980, round-Water Basins in alifornia• <br /> Report-to the l e islatu a in Res o se to Water ode ectio 12924. Bulletin 118-80. <br /> Rogers, T.H. 1966. eolo 'c Map of alifornia an lose Sheet. California Division of <br /> Mines and Geology: (1:250,000). <br /> 19 <br /> .4pp/ied GeoSystems <br />
The URL can be used to link to this page
Your browser does not support the video tag.