My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012750
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0012750
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:54:46 PM
Creation date
5/20/2019 1:51:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012750
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEa <br /> June 25, 1991 <br /> ARCO Service Station 750, Lodi, California <br /> Initial estimates of the effective radius of influence of 22 feet from each vapor extraction <br /> well were made using a vacuum of 30 inches of water column, a flow rate of 50 cmf, an <br /> initial TPHg concentration of 10,000 mg,J.,.}, and the duration of operation of'a vapor <br /> extractions system of 12 months. This estimate of the radius of influence can be further <br /> refired as the subsurface environmental investigation progresses. The location and screened <br /> interval of subsequent vapor-extraction wells will be based on this refined data. <br /> Conclusions <br /> Low levels of residual hydrocarbons were detected in the proposed tank cavity. Results of <br /> the vapor-extraction test indicate the use of vapor extraction at this site is a practical and <br /> efficient chore as a soil remediation alternative. <br /> At the request of ARCO, we will observe the installation of six conductor casings in the <br /> locations shown on PIate 2 before the tanks are installed. These conductor casings will <br /> allow soil borings to be drilled between the new tanks at a later date to delineate the <br /> residual hydrocarbons. After the residual hydrocarbons are delineated vertically and <br /> laterally, vapor-extraction wells can be installed between the proposed tanks to <br /> remediate the soil if warranted. <br /> ARCO is requesting authorization to install the new tanks in the proposed tank cavity as <br /> planned. No remediation will be conducted until we submit 4 Remedial Plan to your agency <br /> and the plan is circulated for a 30-day public review. <br /> r _ <br /> t 06Uctre 4 <br /> 380483 <br />
The URL can be used to link to this page
Your browser does not support the video tag.