My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001725
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001725
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:25:52 PM
Creation date
5/20/2019 2:00:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001725
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEQUOIA ANALYTICAL <br /> 1900 Bates Avenue • Suite LM s Concord, California 94520 <br /> (415) 686-9600 0 FAX (415) 686-9689 <br /> Applied GeoSystems (Sacramento) Client Project ID ARCO #760/#760-91-1 <br /> 4191 E Power Inn Rd <br /> Sacramento, CA 95826 <br /> Attention Eloise Frick QC Sample Group 106-0575 Reported Jun 24, 1991 <br /> QUALITY CONTROL DATA REPORT <br /> ANALYTE <br /> alpha-6HC Aldrin Dieldrin <br /> Method EPA 8080 EPA 8080 EPA 8080 <br /> Analyst M T M T M T <br /> Reporting Units yg/kg u9/kg ug/kg <br /> Date Analyzed Jun 24, 1991 Jun 24, 1991 Jun 24, 1991 <br /> QC Sample# BLK062491 BLK062491 BLK062491 <br /> Sample Conc- N D N D N D <br /> i <br /> Spike Conc <br /> Added 25 25 50 <br /> Conc. Matrix <br /> Spike 19 18 43 <br /> Matrix Spike <br /> %Recovery. 76 72 86 <br /> Conc Matrix <br /> Spike Dup : 24 22 44 <br /> Matrix Spike , <br /> -- Duplicate <br /> %Recovery: 96 88 88 <br /> Relative <br /> %Difference. 23 20 23 <br /> Quality Assurance Statement All standard operating procedures and quality control requirements have been met <br /> SEQUOIA ANALYTIC L %Recovery Conc of M S -Conc of Sample x 100 <br /> Spike Conc Added <br /> Relative%Difference Conc of MS -Cone of M S D x 100 <br /> J 1 R Malerstein (Conc of M S + Conc of M S D) 2 <br /> i P ect Manager 1060575 APS <6> <br />
The URL can be used to link to this page
Your browser does not support the video tag.