My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001725
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001725
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:25:52 PM
Creation date
5/20/2019 2:00:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001725
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 7, 1992 <br /> ARCO Service Station No 760, Lodi, California <br /> Included in our July 29, 1991 submittal to the SJCPHS-EHD requesting installation of <br /> product lines, RESNA also submitted a drilling permit request to the SJCPHS-EHD On <br /> August 22, 1991, Mr Steve Schneider of the SJCPHS-EHD approved the drilling permit <br /> I 2 <br /> Drilling will be conducted using field methods described in our June 13, 1991, Addendum <br /> to Work Plan for subsurface investigation after appropriate permits for drilling the soil <br /> boring offsite are obtained We will modify the vapor-extraction well construction to include <br /> n factory-perforated casing with 0 10-inch-wide slots and the annular space opposite the screen <br /> will be filled with pea gravel to approximately 1 foot above the top of the slotted casing <br /> A maximum interval of 35 feet of slotted casings will be used <br /> LBUTATIONS <br />. This report was prepared in accordance with generally accepted standards of environmental <br /> geological practice in California at the time this investigation was performed This <br /> investigation was conducted solely for the purpose of evaluating environmental conditions <br /> of the soil with respect to gasoline and waste oil near the former underground tanks, <br /> dispensers, and product-delivery lines No soil engineering or geotechnical <br /> recommendations are implied or should be inferred Evaluation of the geologic conditions <br /> at the site for the purpose of this investigation is made from a limited number of <br /> observation points Subsurface conditions may vary away from the data points available <br /> Additional work, including further subsurface investigation, can reduce the inherent <br /> uncertainties associated with this type of investigation <br /> i <br /> 38048-5 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.