My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001725
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001725
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:25:52 PM
Creation date
5/20/2019 2:00:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001725
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 7, 1992 <br /> • ARCO Service Station No 760, Lodi, California <br /> adjacent to the site at the intersection is commercial and residential The former station <br /> configuration is shown on the Generalized Site Plan dated October 1990 (Plate 2) The <br /> former tanks labeled T1, T2, and T3 stored super unleaded gasohne(' ded gasoline, and <br /> Of aded gasoline, respectively <br /> G <br /> PREVIOUS WORK <br /> Previous work and laboratory results pertaining to the investigation of soil at the site have <br /> been documented in various reports and work plans The work is summarized below <br /> Removal of Waste-Oil Tank <br />. In September 1988,RESNA observed the removal of a 550-gallon waste-oil tank east of the <br /> station building (shown on Plate 2) (Applied GeoSystems, November 29, 1988) Results <br /> indicated soil with residual waste-oil remained in place at approximately 7 feet below grade <br /> (Table 1) <br /> r <br /> Drilling Near Former Waste-Oil Tank Cavity <br /> In May 1990,borings B-1 and B-3 were drilled approximately 5 feet beyond the limits of the <br /> excavation to evaluate the lateral extent of the residual waste oil Boring B-2 was drilled <br /> through the former cavity to evaluate the vertical extent of soil with residual waste oil <br /> (RESNA, December 18, 1990) Borings B-1 and B-2 were terminated at 60 feet below <br /> grade, approximately 112 foot below ground water Boring B-3 was terminated at 25-112 <br /> feet below grade The boring locations are shown on Plate 2 <br /> 1. <br /> 38048-5 2 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.