My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001797
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001797
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:30:55 PM
Creation date
5/20/2019 2:03:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001797
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr Kyle Christie Protect 0805-142 003 <br /> April 27, 1995 <br /> Page 3 <br /> agreement EMCON has received authorization, from the property owner north <br /> of the site (Mrs Martinez),to drill and install one vapor extraction well <br /> • EMCON performed quarterly groundwater sampling <br /> • EMCON prepared and subimutted a workplan, dated February 22, 1995, to <br /> conduct an additional subsurface investigation to the San Joaquin County Public <br /> Health Services (SJCPHS) <br /> • On February 14, 1995, EMCON submitted a letter to the SJCPHS. The letter <br /> addressed comments from the SJCPHS regarding the Site Caparison Report for <br /> ARCO service station nos 760 and 548 (1612 Hammer Lane, Stockton) <br /> ANTICIPATED WORK <br /> • Once access has been obtained,EMCON will conduct further off-site assessment, <br /> which will include installation of two vapor extraction wells <br /> o ARCO will continue quarterly monitoring The next sampling event is tentatively <br /> scheduled for May 1995 <br /> CONCLUSIONS <br /> TOG and benzene were below laboratory detection limits in all wells TPHG was detected in <br /> all wells TPHD was not detected in wells MW-2 and MW-3, but was detected in well MW-1 <br /> However, the laboratory indicated that the sample from well MW-1, analyzed for diesel, <br /> contained a hydrocarbon component that eluted in the diesel range. The laboratory indicated <br /> that the eluding peak did not match the typical diesel fingerprint <br /> The groundwater flow direction was toward the south, winch is consistent with the previous <br /> sampling event EMCON requests the assistance of SJCPHS to obtam access from Mr and <br /> Mrs Miguel Guerrero <br /> DOCUMENT DISTRIBUTION <br /> We recommend that copies of this report be forwarded <br /> Mr Linda Turkette <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> P O Box 2009 <br /> Stockton, California 95201 <br /> SACNN 1PJ010805108051420 3AL-941dms 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.