My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001803
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:25:09 PM
Creation date
5/20/2019 2:06:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001803
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Soil cuttings generated during drilling will be stored onsite on and covered with plastic <br /> sheeting. If possible, drill cuttings exhibiting subjective evidence of hydrocarbons or <br /> i producing a positive response on the PID will be separated from those drill cuttings <br /> exhibiting no subjective evidence of hydrocarbons. Four soil samples will be collected from <br /> drill cuttings and composited into one sample at the laboratory to evaluate disposal options <br /> for the soil Borings not converted to wells will be backfilled to surface with a slurry of <br /> cement, bentonite, and water <br /> Construction of Va or-Extraction Wells <br /> Vapor-extraction wells will be constructed of thread pointed, 4-inch-diameter schedule <br /> polyvinyl chloride (PVC) casing. No chemical cements, glues, or solvents will be used in <br /> well construction. The screened portion of the wells will consist of factory-perforated casing <br /> 1 with 010-inch-wide slots A maximum interval of 25 feet of slotted casings will be used <br /> Pea gravel will be placed in the annular space opposite the screen to approximately 1 foot <br /> above the top of the slotted casing A 2-foot bentonite plug will be placed above the sand <br /> pack, and a cement-bentonite slurry will be used to fill the remaining annulus to the surface <br /> A traffic-rated cast-aluminum utility box with a PVC apron will be placed over each <br /> wellhead and set in concrete flush with the surrounding concrete pad This box has a <br /> watertight seal to protect against surface water infiltration and is opened with a special <br /> wrench The design of the box discourages vandalism and reduces the possibility of <br /> e <br /> accidental disturbance of the well <br /> 1 <br /> After the appropriate local and state environmental agencies indicate that remediation of <br /> soil is no longer required, the vapor-extraction wells are removed A drill rig is used to <br /> remove the casing and gravel pack, and the bore hole is backfilled with grout composed of <br /> cement and bentonite from the bottom of the hole to surface grade. <br /> i <br /> r <br /> r <br /> r� 3soaa-7w a <br /> i Working To Restore Nature <br />
The URL can be used to link to this page
Your browser does not support the video tag.