My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001803
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:25:09 PM
Creation date
5/20/2019 2:06:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001803
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
App/fedGenSysfems/nc -- &SAM <br /> - ---- �.Si�r�i <br /> A RESNA Company <br /> Environmental Solutions <br /> Through Applied Science, <br /> 3164 Gold Camp Drive, Suite 200 Engineering&Construction <br /> Rancho Cordova, CA 95670 <br /> Phone (916) 852-6690 <br /> FAX (916) 852-6688 <br /> July 15, 1992 <br /> Mr Chuck Carmel <br /> ARCO Products Company <br /> P O. Box 5811 <br /> San Mateo, California 94402 <br /> Subject. Second Addendum to Work Plan for Additional Subsurface Investigation at <br /> ARCO Service Station No 760, 225 South Cherokee Lane, Lodi, California <br /> Mr Carmel <br /> At the request of ARCO Products Company (ARCO), RESNA Industries (RESNA) has <br /> prepared this Work Plan for conducting a subsurface environmental investigation at and <br /> adjacent to ARCO Service Station No 760 The purpose of the investigation is to further <br /> investigate the lateral and vertical delineation of residual hydrocarbons in soil that were <br /> previously detected at the site The site is shown on the Site Vicinity Map (Plate 1) The <br /> approximate locations of present site features are shown on the Generalized Site Plan(Plate <br /> 2). <br /> Previous Work <br /> In May 1990, three soil borings (B-1 through B-3) were drilled near a former waste-oil tank <br /> east of the station building to evaluate the lateral extent of residual waste oil In October <br /> 1990, three borings (B-4 through B-6) were drilled around the perimeter of the existing <br /> tanks and two borings (B-7 and B-8) were drilled in the area where the new tanks were <br /> proposed <br /> A geologist from RESNA was onsite June 13, 1991, to observe the drilling of three soil <br /> borings and the construction of three vapor-extraction wells (VW-1 through VW-3). A <br /> vapor-extraction test was conducted on June 14, 1991 with the results indicating that vapor- <br /> extraction is a feasible remedial alternative with an effective radius of influence of 22 feet <br /> estimated for the site <br /> i � <br /> � <br /> 3&M8-7W <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.