My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001814
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001814
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:25:25 PM
Creation date
5/20/2019 2:10:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001814
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date October 20,2003 <br /> Quarter 3'0 Quarter,2003 <br /> • ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 760 <br /> Address 225 South Cherokee Lane, Lodi, CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person URS/Vernon Elarth <br /> Consultant Project No 38466244 OL058 <br /> Primary Agency/Regulatory ID No San Joaquin County <br /> Assembly Bill 681 Status Prop"Owned by Gur reet Dhatt and Kuldeep Dhatt <br /> WORK PERFORMED THIS QUARTER (Third 2003): <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth 2003): <br /> I Perform quarterly groundwater monitoring and sampling <br /> 2 Prepare and subrmt quarterly groundwater monitoring report <br /> QUARTERLY RESULTS SUMMARY (Third 2003): <br /> Current Phase of Project Monitoring <br /> Fre uenc of Groundwater Sampling MW-1 through MW-3 sampled quarterly <br /> Frequency of Groundwater Monitoring Quarter) <br /> Is Free Product FP Present Onsite No <br /> FP Recovered this Quarter None <br /> Cumulative FP Recovered to Date None <br /> Current Remediation Techniques None <br /> Approximate Depth to Groundwater 59 82—61 17 feet below ground surface <br /> Groundwater Flow and Gradient Southeast @ 0 013 ft/ft <br /> ANALYTICAL DATA REVIEW: <br /> Based on the review of the analytical and hardcopy data(chain-of-custody records,blanks,dilutions,holding times, <br /> LCS/LCSD results,MS/MSD results,and surrogate recoveries),the data are acceptable as reported by the <br /> laboratory <br /> DISCUSSION: <br /> Total petroleum hydrocarbons as gasoline(TPHg),benzene,xylenes(total),methyl tert-butyl ether(MtBE),and 1,2- <br /> drehloroethane (1,2-DCA) were reported above method detection limits to groundwater samples collected from site <br /> wells this quarter TPHg, benzene, xylenes (total), and MtBE concentrations increased in MW-2 relative to those <br /> reported during the previous sampling event 1,2-DCA concentrations increased in MW-1, MW-2, and MW-3 this <br /> quarter but remain within historic ranges Groundwater elevations in site wells decreased relative to the previous <br /> monitoring event The inferred groundwater flow direction was to the southeast at an average hydraulic gradient of <br /> 0 013 feet/foot <br /> i <br /> K MPP cess\J5 gP ARC0\00760lQumer1y0 QTR 031760 G\VMR 3Q03 do Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.