My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001815
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001815
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:26:59 PM
Creation date
5/20/2019 2:11:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001815
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms Margaret Lagorio Project 20805-142 008 <br /> July 21, 1998 <br /> Page 2 <br /> Well VW-6 was decommissioned by drilling out the well seal, casing and filter pack, and <br /> bottom seal to a depth of 30 feet bgs The drill-out depth was approximately 4 feet below <br /> the bottom of the completed well This overdrill was conducted at the request of the <br /> PHS/EHD, based on soil analytical results for the borehole collected at the time of well <br /> installation in 1992 The borehole was sealed with cement grout placed through a tremie <br /> pipe to within 5 feet of ground surface Cuttings were used to backfill to within 112 foot <br /> of ground surface An asphalt cap was placed flush with existing pavement <br /> Wells VW-12 and VW-13 were decommissioned filling each well with cement grout <br /> placed through tremie pipe to within 5 feet of ground surface A pressure fitting was <br /> installed at each wellhead and a pressure of approximately 30 pounds per square inch <br /> was applied for approximately 3 minutes to force the grout through the filter pack The <br /> upper 5 feet of each well casing and seal were drilled out using hollow-stem auger <br /> drilling equipment Cuttings were used to backfill this interval, and a cement cap was <br /> placed over the former well locations flush with ground surface A copy of the <br /> Department of Water Resources Well Completion Report No 703745, certified by the <br /> drilling contractor, is attached <br /> i� <br /> If you have any questions or comments regarding this letter report, please call us at (530) <br /> 676-6884 <br /> Sincerely, <br /> Pinnacle <br /> Mark Capps, R G J R nson, R G <br /> Project Geologist en or Project Supervisor <br /> Attachments Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> DWR Form 703745 <br /> cc Paul Supple, ARCO Products Company <br /> Pat Anderson, Regional Water Quality Control Board, Central Valley Region <br />(40) <br /> SACIN 1,PJO10805108051420 8AS-981pzusmer 1 Pam",& <br /> Rev 0,7/21/98 <br /> + ,r <br /> i ��� <br />
The URL can be used to link to this page
Your browser does not support the video tag.