My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001817
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:24:00 PM
Creation date
5/20/2019 2:15:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001817
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
!1 rl <br /> Date March 12, 1997 <br /> . ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 00760 Address 225 South Cherokee Lane, Lodi, California <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person EMCON/Jay R Johnson <br /> Consultant Project No 20805-142 005 <br /> Primary Agency/Regulatory ID No Linda Turkatte, San Joaquin County Public Health Services <br /> WORK PERFORMED THIS QUARTER (Fourth 1996)- <br /> 1 EMCON performed quarterly groundwater sampling <br /> 2 EMCON compiled and evaluated groundwater monitoring data <br /> WORK PROPOSED FOR NEXT QUARTER (First 1997) <br /> 1 During the meeting in May 1996, the San Joaquin County Public Health Services authorized semi- <br /> annual groundwater sampling Therefore, ARCO will continue to perform groundwater monitoring on <br /> a semi-annual basis The next sampling event is tentatively scheduled for May 1997 <br /> 2 EMCON will submit a Problem Assessment Report/Site Closure Report evaluating the extent and <br /> mass of petroleum hydrocarbons and recommendations for site closure <br /> Current Phase of Project Remedial Alternatives Being Evaluated <br /> Frequency of Groundwater Sampling Semi-Annual <br /> Frequency of Groundwater Monitoring Semi-Annual <br /> Sampling Date November 25, 1996 <br /> Is Free Product (FP) Present On Site No <br /> FP Recovered this Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Approximate Depth to Groundwater 59 24 to 60 49 <br /> Groundwater Flow Direction South <br /> Groundwater Gradient 0 002 <br /> DISCUSSION <br /> Results of this monitoring event indicated that levels of dissolved gasoline hydrocarbons are consistent <br /> with levels detected during previous sampling events Groundwater gradient is consistent with previous <br /> sampling events Groundwater elevation decreased approximately 2 46 feet from the previous sampling <br /> event (May 1996) MTBE was below laboratory detection limits in groundwater samples collected from all <br /> monitoring wells <br /> • <br /> SA(_W\,PJM805\08051420 5 A 97\prz l <br />
The URL can be used to link to this page
Your browser does not support the video tag.