My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001819
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001819
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:29:30 PM
Creation date
5/20/2019 2:16:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001819
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h q I <br /> Date August 5, 1996 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> • Facility No 00760 Address 225 South Cherokee Lane, Lodi, California <br /> ARCO Environmental Engineer Kyle Christie <br /> Consulting Co/Contact Person EMCON/Jay R Johnson <br /> Consultant Project No 20805-142 005 <br /> Primary Agency/Regulatory ID No Linda Turkatte, San Joaguin County Public Health Services <br /> WORKED PERFORMED THIS QUARTER (Second- 1996) <br /> 1 EMCON performed quarterly groundwater sampling <br /> 2 EMCON compiled and evaluated groundwater monitoring data <br /> WORKED PROPOSED FOR NEXT QUARTER (Third- 1996) <br /> 1 ARCO will continue to perform quarterly groundwater monitoring The next sampling event is <br /> tentatively scheduled for August 1996 <br /> 2 EMCON will prepare a Problem Assessment Report/Remedial Action Plan evaluating the extent and <br /> mass of petroleum hydrocarbons, various alternatives and, if feasible, a closure letter <br /> Current Phase of Project Remedial Alternatives bang <br /> Evaluated <br /> Frequency of Groundwater Sampling Quarterl <br /> Frequency of Groundwater Monitoring Quarterl <br /> Sampling Date May 23, 1996 <br /> Is Free Product (FP) Present On Site Na <br /> FP Recovered this Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Approximate Depth to Groundwater 56 76 to 58 02 <br /> Groundwater Flow Direction Southeast <br /> Groundwater Gradient 0 002 <br /> DISCUSSION <br /> Results of this monitoring event indicated that levels of dissolved gasoline hydrocarbons are consistent <br /> with levels detected during previous sampling events Groundwater gradient is consistent with previous <br /> sampling events Groundwater elevation increased approximately 1 25 feet from the previous sampling <br /> event (February 1996) Historical TPHG concentrations in groundwater and groundwater elevations <br /> versus time are presented in Figures 4 through 6 Because benzene concentrations have been below <br /> . laboratory detection limits during the previous four quarters, hydrographs using benzene concentrations <br /> in groundwater and groundwater elevations versus time were not prepared MTBE was below laboratory <br /> detection limits in groundwater samples collected from all monitoring wells <br /> SACH 1ARC0W7601QTR1.Y1760 QM2-951dms I <br />
The URL can be used to link to this page
Your browser does not support the video tag.