My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001820
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001820
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:42:52 PM
Creation date
5/20/2019 2:16:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001820
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I <br /> 1 <br /> Date May 17, 1996 <br /> • ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 00760 Address 225 South Cherokee Lane, Lodi, California <br /> ARCO Environmental Engineer Kyle Christie <br /> Consulting Co/Contact Person EMCON/Jay R Johnson <br /> Consultant Project No 20805-142 005 <br /> Primary Agency/Regulatory ID No Linda Turkatte, San Joaquin County Public Health Services <br /> WORKED PERFORMED THIS QUARTER (First- 1996) <br /> 1 Performed quarterly groundwater sampling <br /> 2 Compiled and evaluated groundwater monitoring data <br /> WORKED PROPOSED FOR NEXT QUARTER (Second- 1996) <br /> 1 ARCO will continue to perform quarterly groundwater monitoring The next sampling event is <br /> tentatively scheduled for May 1996 <br /> 2 EMCON will finalize the problem assessment report (PAR)/remedial action plan (RAP) <br /> Current Phase of Project Remedial Alternatives being <br /> Evaluated <br /> • Frequency of Groundwater Sampling _ Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product (FP) Present On Site No <br /> FP Recovered this Quarter None <br /> Cumulative FP Recovered to Date None <br /> Approximate Depth to Groundwater 58 02 to 59 29 <br /> Groundwater Gradient South <br /> 0 002 <br /> DISCUSSION (optional) <br /> Results of this monitoring event indicated that levels of dissolved gasoline hydrocarbons are consistent <br /> wdh levels detected during previous sampling events Groundwater gradient is consistent with previous <br /> sampling events Groundwater elevation increased approximately 2 58 feet from the previous sampling <br /> event (November 1995) <br /> ATTACHMENTS <br /> • Table 1 Groundwater Monitoring Data <br /> • Figure 1 Site Map <br /> • Figure 2 Generalized Site Plan <br /> • Figure 3 Groundwater Contour Map (February 1, 1996) <br /> • Appendix A Sampling and Analysis Procedures <br /> • Appendix B Laboratory Analysis Reports and Chain-of-Custody Records <br /> cc Elizabeth Thayer, RWQCB <br /> SAC\[V\P70N0805\08051420 SAS-95\r-jb 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.