Laserfiche WebLink
The following is an itemized list of aboveground petroleum storage act violations that <br /> have not been addressed for RIPON FUEL FACILITY as of May20, 2019. <br /> 1 <br /> t <br /> Open violations from July 19, 2018 inspection <br /> Violation#102- Failed to prepare a written SPCC Plan in accordance with CFR Part 112. <br /> This facility has an Aboveground Petroleum Storage Act(APSA) regulated shell capacity of 20,000 gallons. A Spill <br /> Prevention, Control, and Countermeasure (SPCC) Plan was not available on site. All facilities which have an APSA <br /> regulated shell capacity of 1,320 gallons or greater shall prepare a written SPCC Plan which meets all of the i <br /> requirements of the 40 CFR Part 112. This plan shall be certified by a professional engineer in accordance with 40 I <br /> CFR 112.3(d). Immediately prepare a SPCC Plan in accordance with 40 CFR Part 112, which that includes all <br /> aboveground petroleum storage containers 55 gallons or larger. Submit a copy of the Professional Engineer (PE) <br /> certified SPCC Plan to the EHD for review. (This copy will be returned to the facility after review.) A copy shall be <br /> maintained on site at all times. <br /> li <br /> I <br /> i <br /> Ir <br /> l <br /> i <br /> Page 1 of 1 <br />