Laserfiche WebLink
I , I <br /> 330 South Cherokee Lane TLP 3794-445 <br /> December 1, 1994 Page 5 <br /> TABLE 1 <br /> ESTIMATED COSTS <br /> Task 1 — Work Plan Review, Modification, and Permit Application <br /> 1 Hour Project Manager @ $75/hr $75.00 <br /> *= - -1 t @ $55/hr 275.00 <br /> � , <br /> 3 ea. 13orin its @ $100%a <br /> TASK 1 TOTAL $650.00 <br /> Task 2 — Site Field Work <br /> Labor and Equipment <br /> 26 Hours Geologist @ $50/hr $1,300.00 <br /> 1 Each Mob/Demob @ $260/ea 260.00 <br /> 20 Hours Drilling @ $110/hr 2,200.00 <br /> 2 Days Support Truck @ $50/day 100.00 <br /> 2 Days Steam Cleaner @ $50/day 100.00 <br /> Equipment & Supplies 200.00 <br /> Materials <br /> 13 ea. 55—Gallon DOT Drums @ $35/ea. 455.00 <br /> 3.5 Yard Bentonite Neat Cement @ $150/yd 375.00 <br /> TASK 2 TOTAL $4,990.00 <br /> Task 3 — Laboratory Analysis <br /> 16 ea. TPH—GBTEX (Soil) @ $60/sample 960.00 <br /> 14 ea. TPH-D (Soil) @ $60/sample 840.00 <br /> TASK 3 TOTAL $1,800.00 <br />