Laserfiche WebLink
SHAPE INC. <br /> Project Name: <br /> Project Site: <br /> To Whom It May Concern: <br /> The following pre-start-up checklist must be completed and returned to the SHAPE INC. address <br /> shown below prior to the actual start-up date. Failure to provide accurate information could result in <br /> additional charges due to extra trips to project job site. Under no circumstances will Shape Inc. <br /> waive this requirement. Please allow 10 working days notice to schedule start-up. <br /> YES NO <br /> 1. Pump/Mixer installed and power cable wired into control panel. <br /> 2. Level Controls installed and wired into control panel. <br /> 3. Power supply available and wired into control panel. <br /> 4. Lifting equipment available to lift pump/mixer to surface. <br /> 5. Water supply available to run each pump/mixer for %2 hour. <br /> 6. If Shape Inc. did not supply the control panel or major components, <br /> will a representative of the manufacturer be present for start-up? <br /> 7. Is there a copy of the"AS Built" control or component schematics <br /> at the job site? <br /> 8. Will a representative of the owner be present at start-up for training <br /> of the operation and maintenance of the pump/mixer? <br /> 9. Can pump/mixer be tested without affecting other equipment? <br /> 10. Has the wet well and inlet pipes been cleaned of all debris? <br /> DATE: <br /> NAME: <br /> SIGNATURE: <br /> If you have any questions, please contact John Mohr at 209-324-8058 or Richard Horst at 209-234- <br /> 5909. <br /> SHAPE INC. 119 Val Dervin Parkway, Suite 2 Stockton, CA 95206 <br /> Phone: 209-234-5909 Fax 4: 209-234-5913 <br />