Laserfiche WebLink
KAYU OIL COMPANY QUARTERLY STATUS REPORT <br /> - CALIFORNIA UST PROJECTS <br /> AUGUST 1, 1988 <br /> 3Site Name : FAST GAS STATION 3Project` Status : Monitoring 3 <br /> 3Address : 153 E Eleventh Street 3 3 <br /> 3 Tracy, CA 3Fuel Present : No 3 <br /> 3 3 3 <br /> 3Consultant: Groundwater Technology 3Project MGR: Gregory Fletcher 3 <br /> 3 Inc. 3Project Inception Date : 10/866 3 <br /> 3 3 3 <br /> 1. HIgTORICAL DATA: Soil and groundwater contamination discovered <br /> during removal of three underground storage tanks in October 1986; <br /> approximately 950 cubic yards of soil removed . Preliminary <br /> investigation report dated January 1987 . Second phase investigation <br /> conducted July 1987; former gas station identified as off site source <br /> of contamination. RWQCB has requested continued quarterly monitoring. <br /> Currently awaiting results of investigation being performed by owners of <br /> adjacent property. <br /> 2. kjCk T ACTIVITY; Quarterly monitoring discontinued. Regional $pard ` <br /> Informed we consider our site not to be the source of contamination and <br /> we intend no further action. Verbal discussion with board indicates <br /> they consider this acceptable . Letter to Regional Board pending. <br /> 3. PROJECTED ACTIVITIES: <br /> 3 MONTH 3 DESCRIPTION 3 <br /> 3 August 3 Change locks 3 <br /> 3 3 3 <br /> 3 September 3 No action 3 <br /> 3 3 3 <br /> 3 October 3 No action 3 <br /> 3 3 3 <br /> 3 November 3 No - action 3 <br /> 3 3 3 <br /> 3 December 3 No action 3 <br /> 3 3 3 <br /> 3 January 3 No action 3 <br /> 3 3 3 <br />