My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
3500 - Local Oversight Program
>
PR0544482
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 4:32:17 PM
Creation date
5/20/2019 3:51:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544482
PE
3528
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
02
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rUU <br /> �JUU — 9 — B6 FR I 1 4 C`!9 DLAPcoo ret B I osv L • ms� P . 02 <br /> STATE W CALWOONIA tl[OIICrt OtUKVLAAN e <br /> .Q�ve n1. <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD— <br /> CENTRAL VALLEY REGION .� <br /> �N3 ROUTItR ROAD <br /> SACRAMENTO.CA 85827.3098 <br /> OCT <br /> � X88 <br /> 28 June 1988Nvirl <br /> PERMIT i ssRv��Es L rH <br /> Mr. Michael Hansen • <br /> Kayo Oil Company <br /> P.O. Bax 190 <br /> Lodi, CA 95241 <br /> FINAL REMEDIAL PLAN (FRP) FOR 800 EAST HIGHWAY 12 IN LODI <br /> Thank you for submitting the FRP prepared by Groundwater <br /> Bioremediation Services (a Du Pont subsidiary) . The report is <br /> well prepared, and, based on information presently available to <br /> us, we concur with the proposed remediation. <br /> As this in-situ bioremediation approach for site remediation is <br /> largely untested in California we request that Remedial Progress <br /> Reports (RPR) be submitted on a bi-monthly basis until it is <br /> reliably established that the system is operating as predicted. <br /> Based on the projected time schedule in the FRP, the first RPR is <br /> due 3 Ootober 1988. <br /> If you have any questions, please call me at (916) 361-5731. <br /> GARY S. JOHNSON <br /> Engineering Geologist <br /> GSJ:gj <br /> cc: Ms. Laurie Cotulla, San Joaquin Local Health District, <br /> Stockton <br /> fir'. Dave Ellis, Groundwater Bioremediation Services, <br /> Wilmington, Delaware <br />
The URL can be used to link to this page
Your browser does not support the video tag.