My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
3500 - Local Oversight Program
>
PR0544482
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 4:32:17 PM
Creation date
5/20/2019 3:51:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544482
PE
3528
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
02
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr, J. K. Williamson ~; -2- f 14 August 1985 <br /> and 25299.5 states = <br /> "This chapter shall not be construed to limit or abridge the <br /> powers and duties granted to the`-:State Department of Health <br /> Services by Chapter 6.5 (commencing with Section 25100) and- <br /> Chapter 6.8 (commencing with Section 25300) or to the State <br /> Water Resources Control Board and each regional . water quality <br /> control board by Division 7 (commencing with Section 13000) .of <br /> the Water Code." <br /> California Water Code Section 13267 states in part: <br /> "(a) A regional board, in establishing or reviewing any water quality <br /> control plan - or waste discharge requirements, or in connection <br /> with any action relating thereto or authorized by this division, <br /> may investigate the quality of any waters . of the state within <br /> its region. <br /> (b) In such an investigation, the regional board may require that <br /> any person discharging or proposing to discharge waste within <br /> its region or any citizen .or domiciliary, or political agency or <br /> entity of this state discharging or proposing to discharge waste . <br /> outside of its region that could affect the equality of waters <br /> within its region shall furnish, under penalty of perjury, such <br /> technical or monitoring program reports- as` the board may spec <br /> ify; provided;.that the burden, including costs, of: such reports:. <br /> shall bear a reasonable relationship to the need for; the report <br /> and the benefits- to be otained therefrom." <br /> .} Pursuant to our authority under the Water., Code .and Health and Safety Code we <br /> "request that-you perform the following: F <br /> 1. _ Monitor all ,on-site wells daily at all service ,stations:owned or. operated by <br /> Kayo where gasoline has been determined to have been.-released and -remove <br /> accumulated product found. <br /> 2. Obtain water samples from all ground water monitoring wells on Kayo's sites <br /> and have them analyzed. Samples are to be taken before 30 August 1985 and <br /> results reported to the Regional Board and Local Agencies no later than 20 <br /> days after the samples-- are taken. Analyses shall include: Total hydro- <br /> carbons, Benzene, Toluene, and Xylene, <br /> 3. Submit work plans to the :Regional Board and Local Agencies for review and <br /> approval . The work plans shall include: • installation of additional ground <br /> water monitoring wells 'to supplement .the three currently at each site; and <br /> service station inventory records for _gasoline and diesel fuels. The proposed <br /> wells must be sufficient to characterize the ..areal and vertical. extent of <br /> ground water and soil contamination '.(off-site wells may be required) and may <br /> require phased drilling. The work plan, due by::2 September 1985, is to <br /> include a time schedule for phasing and completing the work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.