My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
3500 - Local Oversight Program
>
PR0544482
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 4:32:17 PM
Creation date
5/20/2019 3:51:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544482
PE
3528
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
02
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> ' r l <br /> HEALM <br /> kj <br /> Ultramar <br /> Ultramar Inc. 3~ `144&.05# 209-585-5685 Credit <br /> P.O.Box 466 <br /> 209-583-3330 Administrative <br /> Ha Third Street 209-583-3302 Information Services <br /> (209)582--00 2411 <br /> Hanford, 9 0466 209-583-3358 Accounting <br /> June 27, 1997 <br /> Ms. Linda Turkette <br /> San Joaquin County Public Health, <br /> Environmental Health Division <br /> P.O. Box 388 <br /> Stockton, CA 95201 <br /> SUBJECT: FORMER BEACON STATION NO. 695, 900 SOUTH CHEROKEE LANE, <br /> STOCKTON, CALIFORNIA <br /> Dear Ms. Turkette: <br /> Enclosed is a copy of the Second Quarter 1997 Groundwater Monitoring Report and the <br /> Addendum to Appendix B/Risk Based Corrective Action Tier 1 and Tier 2 Analysis, Site Closure <br /> Evaluation Report for the above-referenced Ultramar facility. Also included with the report is a <br /> copy of the Quarterly Status Report describing the work performed this quarter and the work <br /> anticipated to be conducted in the next quarter. <br /> Based on a review of all the records that Ultramar has, MW-25 was installed across Cherokee <br /> Lane in November 1988 by DuPont Biosystems. EVAX Technologies installed two(2)wells <br /> designated MW-25 and VW-26 in March 1991. EVAX was not aware that an MW-25 already <br /> existed across the street, and therefore,the designation was changed on the EVAX well to the <br /> next available well designation, MW-27. <br /> In light of the findings presented in the enclosed reports,Ultramar respectfully requests regulatory <br /> site closure. Please do not hesitate to call if you have any questions about this project at(209) <br /> 583-5571. <br /> Sincerely, <br /> UL INC. <br /> Kenneth R Earnest <br /> Senior Project Manager <br /> Marketing Environmental Department <br /> Enclosure: First Quarter 1997 Groundwater Monitoring Report <br /> Addendum to Appendix B/Risk Based Corrective Action Tier 1 and Tier 2 <br /> Analysis, Site Closure Evaluation Report <br /> Quarterly Status Report <br /> cc w/Encl.: Mr. Gordon Boggs, CRWQCB <br /> BEACON <br /> A Member of the Ultramar Group of Companies #1 Quality And Service <br />
The URL can be used to link to this page
Your browser does not support the video tag.