Laserfiche WebLink
=VSYtSat'ioenSt6 <br /> atusReport95 -Lodi, California <br /> Page 2 <br /> SUMMARY OF THIS OUARTER'S ACTIVITIES: <br /> Quarterly groundwater monitoring was performed on March 29, 1996. <br /> Drilled the site for closure in March 1996. <br /> RESULT OF QUARTERLY MONITORING: <br /> Laboratory analyses of the groundwater samples collected from all monitoring wells <br /> indicate MW-8, MW-27 and RW-2 were the only wells to contain detectable amounts of <br /> benzene. <br /> PROPOSED ACTIVITY OR WORK FOR NEXT QUARTER: <br /> ACTIVITY ESTIMATED COMPLETION DATE <br /> Second Quarter groundwater monitoring event June 1996 <br />