Laserfiche WebLink
ENVIRQNMIENTAL HEA1Tit <br /> Ultramar Pr-F j'r SERVICE <br /> Ultramar Inc. -.584-6113 <br /> nc. Ot3ely;2�� &,-6113 Credit a Wholesale <br /> �, 2 <br /> P.O.Box 466 OCT {3 I A '2 3-3330 Administrative <br /> 525 W.Third Street 209-583-3302 Information Services <br /> Hanford,CA 93232-0466 <br /> (209)582-0241 209-583-3358 Accounting <br /> ENVIRONMENTAL PROJECT <br /> QUARTERLY STATUS REPORT <br /> DATE REPORT SUBMITTED: October 21, 1993 <br /> QUARTER ENDING: September 30, 1993 <br /> SERVICE STATION NO.: 695 <br /> ADDRESS: 900 South Cherokee Lane, Lodi, California <br /> COUNTY: San Joaquin <br /> ULTRAMAR CONTACT: Kenneth R. Earnest TEL. NO: 209-583-5571 <br /> BACKGROUND: <br /> Ultramar purchased site from Conoco in July 1990. Several <br /> ground-water monitoring wells had been installed by Conoco <br /> (formerly Kayo Oil Company) at and near the site. At the time <br /> of site purchase, all but six wells (RW-1, MW-16, MW-18, <br /> MW-20, MW-21, and MW-25) were dry. <br /> In March 1991, one additional ground-water monitoring/vapor- <br /> extraction well (MW-27) and one vapor-extraction well (VW-26) <br /> were installed as part of the installation of a vapor <br /> extraction system designed and permitted for the site. Soil <br /> and ground-water analyses showed nondetectable to moderate <br /> TPHg and benzene concentrations. <br /> Permitting for the system was completed and the vapor <br /> extraction system was installed early in the third quarter <br /> 1991. <br /> A permit application for a 500 scfm catalytic incinerator was <br /> approved by the APCD and the system was initiated on September <br /> 20, 1991. <br /> SCARY OF THIS QUARTER'S ACTIVITIES: <br /> Quarterly groundwater monitoring was performed on August 19, <br /> 1993. <br /> BEACON <br /> A Member of the Ultramar Group of Companies #1 Quality and Service <br />