Laserfiche WebLink
M -AME <br /> W-V wmw <br /> RM <br /> Project A152 16 January 1992 <br /> On 23 December, the System was fully monitored. All extractirn l'ines <br /> below 750 Ppm or with water were closed- The load on the extraction <br /> Pump motor was adjusted to over 90% of its capacity. The system <br /> influent was increased to 3000 Ppm by reducing the ambient air intake. <br /> The hydrocarbon extraction nte on 23 December was over 450 Pounds per <br /> day. <br /> From 18 July 1991 <br /> to 23 December the system operated 92.5 days, <br /> extracting approximately 19,465 Pounds of hydrocarbons. This is <br /> equivalent to approximately 3,140 gal 1 ons of hydrocarbons. <br /> Please feel free to call If You have any questions or comments. <br /> Sincerely, <br /> EVAX Technologies, Inc. <br /> Robert A. Nunes <br /> Project Engineer <br /> Enclosures <br /> 1) Influent Chromatogram - 12 November (West Lab) <br /> 2) Effluent Chromatogram -12 November (West Lab) <br /> 3) Influent Chromatogram - 12 November (EVAX Lab) <br /> 4) Effluent Chromatogram -12 November (EVAX Lab) <br /> 5) InFluent Chromatogram - 27 November 0!1st. Lab) <br /> 6) Effluent Chromatogram -27 November Ni�t Lab) <br /> 7) Influent Chromatogram - 10 December (West Lab) <br /> 8) Effluent Chromatogram -10 December (West Lab) <br /> 9) Influent Chromatogram - 23 December (West Lab) <br /> 10) Effluent Chromatogram -23 December (West Lab) <br /> 11) Vapor Probe 4 Chromatogram -23 December (EVAX Lab) <br /> ---------------- <br /> -3- <br />