My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001852
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
3500 - Local Oversight Program
>
PR0544482
>
ARCHIVED REPORTS XR0001852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2019 4:58:10 PM
Creation date
5/21/2019 4:31:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001852
RECORD_ID
PR0544482
PE
3528
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
02
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 April 1993 <br /> Mr Kenneth Earnest <br /> Ultramar Inc <br /> ' 525 west Third Street <br /> Hanford, California 93230 <br /> ' Subject: Beacon Service Station #695 <br /> 1st Quarter 1993 SUES Monitoring Report <br /> 500 SCFM catalytic Incinerator <br /> ' 900 South Cherokee Lane <br /> Lodi, California <br />' Dear Mr Earnest <br />' Tlus report presents you with the results of the monitoring conducted on the soil vapor <br /> extraction system (SVES) and 500 standard cubic feet per minute (scfm) catalytic <br /> incinerator at the above site during the 1st Quarter of 1993 (12 January to 5 April 1993) <br />' The SVES began operation in July 1991 <br /> The report includes an overall summary of the quarterly remediation statistics, a <br /> description of the individual monitoring, tabulated results, and copses of the reports of the <br /> laboratory analyses of vapor samples collected form the system <br /> A site plan is also included showing the layout of the SVES and the location of the <br /> individual vapor extraction system Much consists of 16 monitoring wells, 6 vapor <br /> extraction probes, a 6" diameter recovery well <br /> I PROGRAM STATUS REPORT - I ST QUARTER 1993 <br /> A summary of the remediation systemerformance statistics for the 1 <br /> P st Quarter are <br /> presented in the following table <br /> FIRSTUARTER 1993 REMEDIATION MEDIATION STATISTICS <br /> Soil Vapor Extraction System Beacon Station #695 <br /> Lodi, California <br /> Hydrocarbon Mass extracted - 1 st Quarter 9,595 lb <br /> Hydrocarbon Mass Extracted - Program to Date 79,793 lb <br /> Benzene Mass Extracted - 1st Quarter 65 lb <br /> Benzene Mass Extracted - Program to Date 632 lb <br /> Average Hydrocarbon Extraction Rate - ist Quarter 148 lb /day <br />
The URL can be used to link to this page
Your browser does not support the video tag.