Laserfiche WebLink
16 April 1993 <br /> Mr Kenneth Earnest <br /> Ultramar Inc <br /> ' 525 west Third Street <br /> Hanford, California 93230 <br /> ' Subject: Beacon Service Station #695 <br /> 1st Quarter 1993 SUES Monitoring Report <br /> 500 SCFM catalytic Incinerator <br /> ' 900 South Cherokee Lane <br /> Lodi, California <br />' Dear Mr Earnest <br />' Tlus report presents you with the results of the monitoring conducted on the soil vapor <br /> extraction system (SVES) and 500 standard cubic feet per minute (scfm) catalytic <br /> incinerator at the above site during the 1st Quarter of 1993 (12 January to 5 April 1993) <br />' The SVES began operation in July 1991 <br /> The report includes an overall summary of the quarterly remediation statistics, a <br /> description of the individual monitoring, tabulated results, and copses of the reports of the <br /> laboratory analyses of vapor samples collected form the system <br /> A site plan is also included showing the layout of the SVES and the location of the <br /> individual vapor extraction system Much consists of 16 monitoring wells, 6 vapor <br /> extraction probes, a 6" diameter recovery well <br /> I PROGRAM STATUS REPORT - I ST QUARTER 1993 <br /> A summary of the remediation systemerformance statistics for the 1 <br /> P st Quarter are <br /> presented in the following table <br /> FIRSTUARTER 1993 REMEDIATION MEDIATION STATISTICS <br /> Soil Vapor Extraction System Beacon Station #695 <br /> Lodi, California <br /> Hydrocarbon Mass extracted - 1 st Quarter 9,595 lb <br /> Hydrocarbon Mass Extracted - Program to Date 79,793 lb <br /> Benzene Mass Extracted - 1st Quarter 65 lb <br /> Benzene Mass Extracted - Program to Date 632 lb <br /> Average Hydrocarbon Extraction Rate - ist Quarter 148 lb /day <br />