i • i
<br /> TABLE II
<br /> EVAX TECHNOLOGIES, INC
<br /> INCINERATOR SYSTEM AND TVH SUMMARY
<br /> SITE. Beacon Station #695 Incinerator Start Up. 18 JULY 1991
<br /> 900 South Cherokee Lane
<br /> Lodi, California
<br /> AVERAGE
<br /> DILUTION INFLUENT TOTAL TOTAL
<br /> INLET OUTLET VALVE SYSTEM PRESSURE FLOU TVH TVH TVH OPERATING LBS/DAY INFLUENT INFLUENT GALLONS
<br /> OPERATING TEMP TEMP POSITION VACUUM CHANGE RATE INFLUENT INFLUENT EFFLUENT DAYS IN IN LBS PER LBS TO TO
<br /> DATE HOURS (oF) (oF) (0 or C) (In HG) (In H20) (scfm) (ppm) (lbs/day) (ppm) INTERVAL INTERVAL INTERVAL DATE DATE
<br /> ------------------------------------------------------------------------------------------------------------------------------------------------------------------
<br /> 05/06/92 24 600 948 0 3 0 2 2 329.8 1,734 203 1 ND
<br /> S8 5 215 7 3,990 8 36,760.8 5,929.2
<br /> 04/17/92 24 60D 930 0 4 8 2 2 329 8 1,949 228 3 ND
<br /> 5.5 212.8 1,169.2 32,770.1 5,285.5
<br /> 04/10/92 24 600 918 0 3 0 2.2 328 3 1,688 146 8 W 290.7 2,616 0 31,500.8 5,096.4
<br /> 02/07/92 24 600 750 0 3 8 3.5 416 0 2,602 384.5 NA
<br /> 9 5 339.7 3,226.8 28,984.8 4,675.0
<br /> 01/22/92 24 600 720 0 2 5 4.3 461 1 1,800 294.8 160
<br /> 16.5 381.4 6,242.4 25,758 0 4,154.5
<br /> 12/23/91 24 600 860 0 4 0 3.9 439 1 3,000 468 0 120
<br /> 8 443.4 3,547.4 19,465.1 3,139.5
<br /> 12/10/91 24 600 827 0 4 0 4.5 471 7 2,500 418.9 190
<br /> 9 283.3 2,550.0 15,917.7 2,567 4
<br /> 11/27/91 24 600 940 0 5 0 3.5 416 0 1,000 147.8 4
<br /> 8.5 162 5 1,381.7 13,367.8 2,156.1
<br /> 11/12/91 24 600 898 0 6.5 3.5 416.0 1,200 177.3 10
<br /> 3 206.9 620 b 11,986.1 1,933.2
<br /> 11/1/91 24 600 940 0 6.5 3.5 416.0 1,600 236.4 13
<br /> 10.5 435.4 4,571.8 11,365.5 1,833.1
<br /> 10/15/91 F1 24 600 410 0 1.9 6 3 558.1 3,200* 634.4 W
<br /> 10/15/91 IN 24 600 712 0 2 9 5 55 523.9 1150 21.4 6*
<br /> 9 106.2 956.1 6,793.6 1,095 7
<br /> 9/10/91 24 600 940 0 1 0 2.2 336.2 1,600 191.1 26
<br /> 20 163.0 3,260 7 5,837.5 941.5
<br /> 8/20/91 24 600 930 0 1 0 0.45 152 0 2,500 135 0 13
<br /> 17 111 6 1,897.3 2,576.8 415 6
<br /> 7/31/91 24 630 900 0 1 0 0.3 124.1 2,000 88 2 12
<br /> b 5 86.0 558 9 674.5 104.6
<br /> 7/24/91 24 620 900 0 1 0 0.3 124.1 1,900 83.8 7
<br /> 1 120.6 120.6 120.6 19.5
<br /> 7/18/91 24 610 915 0 1.0 0.35 134.1 3,306 157 5 41
<br /> TOTAL OPERATING DAYS 151.5
<br /> Vacuum - System Vacuum In Inches of Mercury.
<br /> scfm - Standard cubic feet per minute.
<br /> TVH - Modified EPA Method 8015, detection limit = 1.0 ppm.
<br /> RD - Not detected ° - TVHby Field portable Flame Ionisation Detector (FID)
<br /> IIA - Not available. IN - Initial System Condition before adjustment. +
<br /> HT - Not tested. FI - Final System Condition after adjustment. 1
<br />
|