My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001856
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
3500 - Local Oversight Program
>
PR0544482
>
ARCHIVED REPORTS XR0001856
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2019 4:54:24 PM
Creation date
5/21/2019 4:32:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001856
RECORD_ID
PR0544482
PE
3528
FACILITY_ID
FA0000556
FACILITY_NAME
CHEROKEE LANE SERVICE STATION*
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
02
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Ultramar Inc Telecopy 209 584 6113 Credd&Wholesale <br /> P O Box 466 209 583 3330 Administrative <br /> 525 W Third Street 209 583 3302 Information Services <br /> Hanford CA 93232-0466 209 583 3358 Accounting <br /> (209)582 0241 <br /> ENVIRONMENTAL PROJECT <br /> QUARTERLY STATUS REPORT <br /> alt'= <br /> DATE REPORT SUBMITTED: July 31, 1992 <br /> AUG 0 4 1992 <br /> QUARTER ENDING: June 30, 1992 ENVIRONMENTAL HEALTH <br /> SERVICE STATION NO. : 695 PERMIT/SERVICES <br /> ADDRESS: 900 South Cherokee Lane, Lodi , California <br /> COUNTY: San Joaquin <br /> ULTRAMAR CONTACT: Kenneth R. Earnest TEL. NO: 209-583-5571 <br /> BACKGROUND: <br /> Ultramar purchased site from Conoco in July 1990. Several <br /> ground-water monitoring wells had been installed by Conoco <br /> (formerly Kayo Oil Company) at and near the site. At the time <br /> of site purchase, all but six wells (RW-1, MW-16, MW-18, <br /> MW-20, MW-21 , and MW-25) were dry. <br /> In March 1991 , one additional ground-water monitoring/vapor- <br /> extraction well (MW-27) and one vapor-extraction well (VW-26) <br /> were installed as part of the installation of a vapor <br /> extraction system designed and permitted for the site. Soil <br /> and ground-water analyses showed nondetectable to moderate <br /> TPHg and benzene concentrations. <br /> Permitting for the system was completed and the vapor <br /> extraction system was installed early in the third quarter <br /> 1991 . <br /> A permit application for a 500 scfm catalytic incinerator was <br /> approved by the APCD and the system was initiated on September <br /> 20, 1991 <br /> SUMMARY OF THIS QUARTER'S ACTIVITIES: <br /> Quarterly groundwater monitoring was performed on June 17, <br /> 1992 <br /> As of May 6, 1992 a total of 36,760 pounds of hydrocarbons <br /> have been destroyed utilizing vapor extraction (equivalent to <br /> approximately 5,930 gallons of gasoline) . <br /> IFURSc m <br /> A Member of the Ultramar Group of Companies #1 Qudltty and Service <br /> Ultramar <br />
The URL can be used to link to this page
Your browser does not support the video tag.