Laserfiche WebLink
PROPERTY LINE <br /> 4 <br /> MW-18 <br /> i <br /> i <br /> t � <br /> i <br /> E <br /> WAREHOUSE I <br /> i TEMPORARY <br /> POWER SERVICE <br /> ATTACHED TO <br /> WEATHERHEAD <br /> (CORNER OF <br /> NATURAL BUILDING)GAS <br /> I <br /> METER II I <br /> SOIL VAPOR EXTRACTION I <br /> PIPING MANIFOLD <br /> MEDIUM I = MW-15 <br /> iPRESSURE MOISTURE SEPARATORS I <br /> GAS LINE <br /> i <br /> � n <br /> i MW-28 <br /> BLOWER V O26 I <br /> iCATALYTIC OXIDIZER <br /> x MW-1 <br /> MW-17 <br /> vEW-10 vEW-11 <br /> i I <br /> TAW-23 � — North <br /> FORMER AANNDE <br /> TANK GARAGE <br /> 0 20 FT <br /> LOCATION <br /> � I <br /> I <br /> SCALE <br /> LEGEND <br /> VAPOR EXTRACTION WELLS � <br /> - ----sem EXISTING FENCE VEW-1 A.%C,D FIGURE 3 <br /> --ir---��-- PROPOSED 6 FEET CHAIN LINK FENCE WITH SLATS VEW--2 A.B.C,D <br /> - SURE (STC-25) NOTES. VEN-3 A.B.0 REMEDIATION SYSTEM LOCATION MAP <br /> PROPOS® 70 FEET HIGH SOUND ENCLO <br /> ® VEW-4 A.B.0 BEACON STATION NO E95 <br /> MANHOLE 1) APPLIANCE MAXIMUM BTU RATING 1 METTU/Hr 5 <br /> YEW-5 aB.C.D <br /> Qs VW-26 VAPOR EXTRACTION WELL LOCATION 2) ABOVE GRADE MEDIUM PRESSURE GAS LINE TO BE GREATER YEW-6 A.B.C,D 900 SOUTH CHEROKEE LANE <br /> QQ RW-1 VAPOR EXTRACTION/RECOVERY WELL LOCATION THAN 6' ABOVE: GRADE IN REMEDIATION AREA. <br /> GAS UNE TO BE SUPPORTED AND ANCHORED TO VEW 8 �'C LODI, CA <br /> MW-27 VAPOR EXTRAACTION/MONITORING WELL LOCATION CONCRETE PAD VEW-g B'C'D P <br /> FNO <br /> ECT91 DRAWN BY <br /> YEw-e aB.c,D $,s I.tL 7/5/94 <br /> MW-18 MONITORING WELL LOCATION 3) PRESSURE TEST REQUIRED PER CITY OF LODI BUILDING DEPARTMENT VEW-10 A.B.C.D PREPARED 9Y �� Delta <br /> VEW-5 VAPOR EXTRACTION WELL LOCATION - MULTIPLE WELLS MEDIUM PRESSURE GAS UNE TO BE TESTED AT 10 PSIG FCR 1 HOUR -s CAC Envtr+onmsntal <br /> AT EACH LOCATION (SEE TABU VEW-11 A.S.C.D R"1014 NO ar <br /> VEYV-72 aB,C 2 Consulicnls. Inc <br /> ti <br /> 1 <br />